Yayi Park station

Yayi Park

亚艺公园
Platform
Chinese name
Simplified Chinese亚艺公园站
Traditional Chinese亞藝公園站
Transcriptions
Standard Mandarin
Hanyu PinyinYàyì Gōngyuán Zhàn
Yue: Cantonese
Yale RomanizationA'ngaih Gūng'yún Jaahm
JyutpingAa3ngai6 Gung1jyun2 Zaam6
General information
LocationIntersection of Lvjing Road (绿景路) and Wenhua Road Middle (文华中路), Shiwanzhen Subdistrict
Chancheng District, Foshan, Guangdong
China
Coordinates23°0′16.42″N 113°7′27.55″E / 23.0045611°N 113.1243194°E / 23.0045611; 113.1243194
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
South section
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF321
History
Opened28 December 2022 (2022-12-28)
Previous namesShencun (深村)
Services
Preceding station Foshan Metro Following station
Jihua Liulu Line 3
South section
Wanhua
Location

Yayi Park station (simplified Chinese: 亚艺公园站; traditional Chinese: 亞藝公園站; pinyin: Yàyì Gōngyuán Zhàn; Cantonese Yale: A'ngaih Gūng'yún Jaahm; lit. 'Asian Art Park station') is a station on Line 3 of Foshan Metro, located in Foshan's Chancheng District.[1] It opened on 28 December 2022.[2][3]

Station layout

The station has an island platform under Middle Wenhua Road.[4]

G - Exits A-D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1  3  towards Zhongshan Park (Jihua Liulu)
Island platform, doors will open on the left
Platform 2  3  towards Shunde College Railway Station (Wanhua)

Platform

Although this station is not included in the themed stations of the first section of Line 3, it is also designated as a "clean culture theme station".[5] The columns, elevators and some walls of the concourse and platform are decorated with a clean theme based on lion dance and lotus elements.

Entrances/exits

The station has 4 points of entry/exit, located on the north and south sides of Wenhua Road Middle. Exits A and C are accessible via elevators.[1]

  • A: Wenhua Road Middle
  • B: Lüjing 3rd Road, Foshan Agile Garden
  • C: Wenhua Road Middle, Asian Art Park
  • D: Lüjing 3rd Road, Wenhua Park

History

The station was called Shencun station during the planning and construction phase, named after Shencun Village west of the station. In 2022, the station was renamed to Yayi Park station after the Asia Art Park where the station is located.

On 13 October 2017, the first diaphragm wall reinforcement cage of the main envelope structure of the station was successfully hoisted into the station pit.[6] On 17 November 2017, the station began enclosure construction.[7] On 17 June 2020, the main station structure was successfully topped out.[8] On 3 September 2020, the double line tunnel between this station and Wanhua successfully broke through.[9] On 25 May 2021, the double line tunnel between this station and TV Tower station (now Jihua Liulu) successfully broke through.[10]

On 29 June 2022, the sub-unit project of the station passed acceptance. On 15 July 2022, the station successfully completed the fourth phase of traffic diversion and reform and realized the enclosure construction of the remaining projects.[11]

References

  1. ^ a b "亚艺公园" [Yayi Park]. Foshan Metro (in Simplified Chinese). Foshan Metro.
  2. ^ 北青网 (28 December 2022). "广东佛山地铁3号线首通段正式开通运营" [The first section of Guangdong Foshan Metro Line 3 officially opened for operation] (in Simplified Chinese). Retrieved 22 July 2024.
  3. ^ "Foshan opens metro Line 3". Metro Report International. 29 December 2022. Archived from the original on 8 May 2024. Retrieved 22 July 2024.
  4. ^ 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
  5. ^ "佛山地铁首座廉洁主题车站和首趟廉洁主题列车正式亮相地铁3号线" [Foshan Metro's first integrity-themed station and train officially debuted on Metro Line 3]. Foshan Metro Co. Ltd. (in Simplified Chinese). 29 December 2022. Archived from the original on 30 August 2023. Retrieved 21 September 2025.
  6. ^ "三号线|深村站 首幅连续墙钢筋笼顺利入槽" [Line 3 - Shencun Station: First diaphragm wall reinforcement cage successfully installed]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 18 October 2017. Retrieved 21 September 2025 – via Foshan Metro Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)
  7. ^ 林丹 (10 November 2017). "亚艺公园站下周五起围蔽施工" [Asia Arts Park Station will be fenced off for construction starting next Friday]. Information Times (in Simplified Chinese). Archived from the original on 29 July 2022. Retrieved 21 September 2025 – via Sina News.
  8. ^ "佛山地铁进展曝光!二号线或将于下月底全线贯通" [Foshan Metro's progress revealed! Line 2 may be fully operational by the end of next month]. Foshan Rail Transit Bureau (in Simplified Chinese). 24 June 2020. Archived from the original on 29 July 2022. Retrieved 21 September 2025.
  9. ^ 林嘉慧 (10 September 2020). "湾华至深村站实现双线贯通" [Double-track connection from Wanhua to Shencun Station]. Foshan Daily (in Simplified Chinese). Archived from the original on 29 July 2022.
  10. ^ "三号线|首通段建设取得新进展" [Line 3 - New progress made in the construction of the first section]. Foshan Railway Investment and Construction Group. 27 May 2021. Retrieved 21 September 2025 – via Foshan Metro Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)
  11. ^ "3号线|首通段深村站的两张"成绩单"" [Line 3 - Two "report cards" of Shencun Station, the first section of the line]. Foshan Railway Investment and Construction Group. 19 July 2022. Retrieved 21 September 2025 – via Foshan Metro Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)