Xingye Donglu station

Xingye Donglu

兴业东路
Platform
Chinese name
Simplified Chinese兴业东路站
Traditional Chinese興業東路站
Transcriptions
Standard Mandarin
Hanyu PinyinXīngyè Dōnglù Zhàn
Yue: Cantonese
Yale RomanizationHīngyihp Dūnglǒu Jaahm
JyutpingHing1yip6 Dung1lou6 Zaam6
General information
LocationXingye East Road (兴业东路), Shishan
Nanhai District, Foshan, Guangdong
China
Coordinates23°5′32.82″N 113°1′22.04″E / 23.0924500°N 113.0227889°E / 23.0924500; 113.0227889
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
North section
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF334
History
Opened23 August 2024 (2024-08-23)
Services
Preceding station Foshan Metro Following station
Kesheng Lu Line 3
North section
Foshan West Railway Station
towards Lianhe
Location

Xingye Donglu station (simplified Chinese: 兴业东路站; traditional Chinese: 興業東路站; pinyin: Xīngyè Dōnglù Zhàn; Cantonese Yale: Hīngyihp Dūnglǒu Jaahm; lit. 'Xingye East Road station') is a station on Line 3 of Foshan Metro, located in Foshan's Nanhai District.[1] It opened on 23 August 2024.[2][3]

Station layout

The station has an island platform under Xingye East Road.[1]

G - Exits A, C & D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2 - Station Equipment
L3
Platforms
Platform 1  3  towards Foshan University (Kesheng Lu)
Island platform, doors will open on the left
Platform 2  3  towards Lianhe (Foshan West Railway Station)

Entrances/exits

The station has 3 points of entry/exit, lettered A, C and D, located on the north and south sides of Xingye East Road.[4] Exits C and D are accessible via elevators.[5]

  • A: Xingye Road
  • C: Xingye Road
  • D: Xingye Road

History

When Line 3 was approved in 2012, this station was not included.[6] In 2015, the planning of Line 3 was changed, and this station was added to the line, known then as Xingye Lu station.[7] In 2022 the station name was adjusted to Xingye Donglu station.

The station officially started construction on 17 December 2016,[8] completed the pouring of the first base plate on 30 April 2019,[9] and the main structure topped out on 27 April 2021.[10]

References

  1. ^ a b 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
  2. ^ 李传智 (20 August 2024). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 20 August 2024. Retrieved 22 August 2024.
  3. ^ 刘佳伦 (23 August 2024). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 23 August 2024. Retrieved 24 August 2024.
  4. ^ "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 20 August 2024. Archived from the original on 20 August 2024. Retrieved 22 August 2024 – via Official NetEase account.
  5. ^ "兴业东路" [Xingye Donglu]. Foshan Metro (in Simplified Chinese). Foshan Metro.
  6. ^ 李传智 (7 June 2013). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [The second environmental impact assessment announcement for Metro Line 3 was released: Line 3 will transfer with 7 metro lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 25 July 2022. Retrieved 22 August 2024 – via Sina News.
  7. ^ 李传智; 何超 (22 July 2015). "最长地铁线串起14条轨道线" [The longest subway line connects 14 rail lines]. Guangzhou Daily (in Simplified Chinese) – via Foshan Municipal People's Government.{{cite news}}: CS1 maint: deprecated archival service (link)
  8. ^ "【地铁3号线】荔村站、兴业路站施工,请注意绕行" [[Metro Line 3] Licun Station and Xingye Road Station are under construction, please take detours]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 21 December 2016. Retrieved 22 August 2024 – via Foshan Metro Official WeChat Account.{{cite web}}: CS1 maint: deprecated archival service (link)
  9. ^ "三号线|兴业路站首块底板顺利浇筑完成" [Line 3 - The first base slab of Xingye Road Station was successfully poured]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 30 April 2019. Retrieved 22 August 2024 – via Foshan Metro Official WeChat Account.{{cite web}}: CS1 maint: deprecated archival service (link)
  10. ^ "三号线|实现第二十座车站主体结构封顶" [Line 3 - The main structure of the 20th station has been capped]. Foshan Metro Official WeChat Account (in Simplified Chinese). 26 December 2019. Retrieved 22 August 2024.{{cite news}}: CS1 maint: deprecated archival service (link)