Shunde No.1 High School station

Shunde No.1 High School

顺德一中
Platform
Chinese name
Chinese顺德一中站
Transcriptions
Standard Mandarin
Hanyu PinyinShùndé Yīzhōng Zhàn
Yue: Cantonese
Yale RomanizationSeuhndāk Yātjūng Jaahm
JyutpingSeon6dak1 jat1zung1 Zaam6
General information
LocationDezhi Road (德智路) between Park Boulevard (公园大道) and Bigui Road (碧桂路), Daliang Subdistrict
Shunde District, Foshan, Guangdong
China
Coordinates22°50′7.76″N 113°17′19.46″E / 22.8354889°N 113.2887389°E / 22.8354889; 113.2887389
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
South section
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF304
History
Opened28 December 2022 (2022-12-28)
Services
Preceding station Foshan Metro Following station
Jurong Beilu Line 3
South section
Shunde OCT Harbour PLUS
Location

Shunde No.1 High School station (Chinese: 顺德一中站; pinyin: Shùndé Yīzhōng Zhàn; Cantonese Yale: Seuhndāk Yātjūng Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]

Station layout

The station has an island platform under Dezhi Road.[4]

G - Exits A & C
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1  3  towards Zhongshan Park (Jurong Beilu)
Island platform, doors will open on the left
Platform 2  3  towards Shunde College Railway Station (Shunde OCT Harbour PLUS)

Entrances/exits

The station has 2 points of entry/exit, located on the north and south sides of Dezhi Road. Exit A is accessible via elevator.[1]

  • A: Bigui Road
  • C: Dezhi Road

History

The station was called Creative Park station during the planning and construction phase. It was renamed to Shunde No. 1 High School station in 2022.

The main structure of the station was topped out on 19 November 2019[5] and handled over to mechanical and electrical construction on 2 April 2021. The left line tunnel from this station to Jurong Beilu broke through on 28 August 2020.[6] The double line tunnel to Fengsha station (now Shunde OCT Harbour PLUS broke through on 23 May 2021.[7] On 31 July 2022, the site passed the project acceptance.[8] On 28 December the same year, the station opened with the opening of Line 3.[9]

References

  1. ^ a b "顺德一中" [Shunde No.1 High School]. Foshan Metro (in Simplified Chinese). Foshan Metro.
  2. ^ 北青网 (28 December 2022). "广东佛山地铁3号线首通段正式开通运营" [The first section of Guangdong Foshan Metro Line 3 officially opened for operation] (in Simplified Chinese). Retrieved 21 July 2024.
  3. ^ "Foshan opens metro Line 3". Metro Report International. 29 December 2022. Archived from the original on 8 May 2024. Retrieved 21 July 2024.
  4. ^ 梁焯贤 (28 December 2019). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 26 June 2022 – via Foshan Municipal People's Government.
  5. ^ "佛山地铁3号线创意园站主体结构顺利封顶" [The main structure of Foshan Metro Line 3 Creative Park Station has been successfully topped out]. China Communications Construction Tunnel Bureau Nanjing Branch (in Simplified Chinese). 21 November 2019. Retrieved 17 September 2025 – via Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)
  6. ^ "三号线|创意园站-驹荣北路站区间左线顺利贯通" [Line 3 - The left line between Creative Park Station and Jurong North Road Station is successfully connected]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 31 August 2020. Retrieved 17 September 2025 – via Foshan Metro Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)
  7. ^ "三号线|首通段建设取得新进展" [Line 3 - New progress made in the construction of the first section]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 27 May 2021. Retrieved 17 September 2025 – via Foshan Metro Official WeChat Account.{{cite news}}: CS1 maint: deprecated archival service (link)
  8. ^ "佛山市城市轨道交通三号线工程3202-4标段子单位工程顺利通过验收" [The 3202-4 section of Foshan Urban Rail Transit Line 3 project has successfully passed the acceptance inspection]. China Communications Construction Co., Ltd. (in Simplified Chinese). 31 July 2022. Retrieved 17 September 2025 – via Official WeChat Account of "CCCC Foshan Metro Project".{{cite web}}: CS1 maint: deprecated archival service (link)
  9. ^ 陈飞龙 (24 December 2022). "官宣!佛山地铁3号线首通段12月28日正式开通" [Official Announcement! The first section of Foshan Metro Line 3 officially opened on December 28th] (in Simplified Chinese). Southern Metropolis Daily. Archived from the original on 24 December 2022. Retrieved 17 September 2025.