Tiantongyuandong station

Tiantongyuandong[1]

天通苑东
Concourse
General information
LocationInterchange between Baifang Road (白坊路) and Beiyuan East Road (北苑东路)
Border between Tiantongyuanbei Subdistrict and Tiantongyuannan Subdistrict, Changping District, Beijing
People's Republic of China
Coordinates40°03′54″N 116°26′09″E / 40.06498°N 116.43592°E / 40.06498; 116.43592
Operated byBeijing MTR (Line 17)
Beijing Mass Transit Railway Operation Corporation Limited (Line 18)
Lines
Platforms6 (3 island platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 17: December 30, 2023 (2023-12-30)
  •      Line 18: December 27, 2025 (2025-12-27)
Services
Preceding station Beijing Subway Following station
Weilaikexuecheng (Future Science City) Line 17 Qingheying
towards Jiahuihu
Taipingzhuang
towards Malianwa
Line 18 Terminus
Location
Tiantongyuandong[1]
Location in Beijing

Tiantongyuandong station[1] (Chinese: 天通苑东站; pinyin: Tiāntōngyuàn Dōng Zhàn; lit. 'Tiantongyuan East') is an interchange station between Line 17 and Line 18 of the Beijing Subway. The Line 17 station opened on December 30, 2023, becoming the fourth subway station within Tiantongyuan area.[2][3] Line 18 opened at this station on December 27, 2025.

Location

The station is located under the interchange between Baifang Road (白坊路) and Beiyuan East Road (北苑东路) on the border between Tiantongyuanbei Subdistrict and Tiantongyuannan Subdistrict, in Changping, Beijing.[4]

Station features

The Line 17 station has 2 underground island platforms and 4 tracks,[5] with a total length of 555.9 metres and a total width of the main structure of 45.3 metres.[6] The Line 18 station has a separate underground island platform.

Exits

When the station initially opened, there were 5 exits, lettered A, B, C, D1 and D2. All of them led to Beiyuan East Road. When the Line 18 station opened, Exits E and F opened, which led to Baifang Road. Exit C and E are accessible via elevators.

History and future development

The structure of the station was completed in early 2022.[7]

The station is planned to be the interchange station with Line 18[8] and main line and branch line of Line 17,[9] with the former having opened on December 27, 2025.

References

  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2024-01-02.
  2. ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
  3. ^ "北京地铁17号线北段计划今年底开通试运营_中新社_北京分社". www.bj.chinanews.com.cn (in Simplified Chinese). Retrieved 2023-12-18.
  4. ^ "地名公告" (in Simplified Chinese). 2023-07-01. Retrieved 2023-12-19.{{cite web}}: CS1 maint: deprecated archival service (link)
  5. ^ "中交路建精心建造北京地铁17号线天通苑东站-中新网". www.chinanews.com.cn. Retrieved 2023-12-19.
  6. ^ "要闻 ‖ 防风险,除隐患,遏事故! 弓天云率检查组赴北京地铁17号线3标调研指导". Weixin Official Accounts Platform. Retrieved 2023-12-19.
  7. ^ "17号线天通苑东站主体结构封顶 其余段计划于2023年开通_信息提示_首都之窗_北京市人民政府门户网站". www.beijing.gov.cn. Retrieved 2023-12-19.
  8. ^ "轨道交通13号线拆分工程规划方案公示(公示期限30天)" [Public announcement of the planning plan for the splitting project of Rail Transit Line 13 (publication period is 30 days)] (in Chinese). Beijing Municipal Commission of Planning and Natural Resources. November 22, 2018. Archived from the original on 2018-11-22. Retrieved 2023-12-19.
  9. ^ "北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf" (PDF). China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived from the original (PDF) on 2022-07-09. Retrieved 2023-12-19.