Dongdaqiao station

Dongdaqiao

东大桥
Line 6 platform
Chinese name
Simplified Chinese东大桥站
Traditional Chinese東大橋站
Literal meaningEast Big Bridge Station
Transcriptions
Standard Mandarin
Hanyu PinyinDōng Dà Qiáo Zhàn
General information
LocationEast Workers' Stadium Road (工人体育场东路) / Dongdaqiao Road (东大桥路) and Chaoyangmen Outer Street / North Chaoyang Road (朝阳北路)
Chaoyang District, Beijing
China
Coordinates39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657
Operated byBeijing Mass Transit Railway Operation Corporation Limited (Lines 6, 22 and 28)
Beijing MTR (Line 17)
Lines
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 6: December 30, 2012 (2012-12-30)
  •      Line 17: December 27, 2025 (2025-12-27)
Services
Preceding station Beijing Subway Following station
Chaoyang Men
towards Jin'anqiao
Line 6 Hujialou
towards Luyang
Workers' Stadium Line 17 Yong'an Li
towards Jiahuihu
Future services
Terminus Pinggu line
Opening 2029
Jintai Xizhao
towards Pinggu
Line 28
Opening 2029
Jintai Xizhao
towards Guangqudonglu
Location
Dongdaqiao
Location in central Beijing

Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is an interchange station between Line 6 and Line 17 of the Beijing Subway.[1] The Line 6 station opened on December 30, 2012,[2][3] and the Line 17 station opened on December 27, 2025.[4]

Station features

The station has underground island platforms for both Line 6 and Line 17.

Exits

There are 6 exits, lettered A, B, D1, E, F and G. Exits A, B and D1 are situated on the Line 6 concourse, Exits E and F are situated on the Line 17 north concourse and Exit G is situated on the Line 17 south concourse. Exits D1, E and G are accessible via elevators.

References

  1. ^ "地铁6号线一期沿线站名确定-北京网交通出行". Archived from the original on 2013-12-24. Retrieved 2013-03-19.
  2. ^ "轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 - 要闻速递 - 北京市交通委员会". Archived from the original on 2012-11-11. Retrieved 2012-12-26.
  3. ^ 北京四地铁线30日开通 首末车时间确定 (in Simplified Chinese). 新京报. Retrieved 26 December 2012.
  4. ^ "明日开通试运营!北京3条(段)地铁新线来啦" [Three new subway lines (or sections) in Beijing will open for trial operation tomorrow!] (in Simplified Chinese). Beijing Daily. 26 December 2025. Retrieved 27 December 2025. 2025年12月27日(周六)首班车起,地铁17号线中段(工人体育场—十里河)、18号线(马连洼—天通苑东)、6号线南延(潞城—潞阳)等3条(段)城市轨道交通新线将开通试运营 [Starting from the first train on Saturday, December 27, 2025, three new urban rail transit lines (sections) will open for trial operation: the middle section of Metro Line 17 (Workers' Stadium - Shilihe), Line 18 (Malianwa - Tiantongyuandong), and the southern extension of Line 6 (Lucheng - Luyang).]
  • Media related to Dongdaqiao Station at Wikimedia Commons