Songgang station

Songgang

松岗
Line 11 platform
Chinese name
Traditional Chinese松崗
Simplified Chinese松岗
Transcriptions
Standard Mandarin
Hanyu PinyinSōnggǎng
Yue: Cantonese
Yale RomanizationChùhnggōng
JyutpingCung4gong1
General information
LocationBao'an District, Shenzhen, Guangdong
China
Coordinates22°46′41″N 113°52′10″E / 22.77806°N 113.86944°E / 22.77806; 113.86944
Operated bySZMC (Shenzhen Metro Group)
Shenzhen Line 12 Rail Transit Co., Ltd (Shenzhen Metro Group and PowerChina PPP)
Lines
Platforms8 (2 island platforms and 4 side platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
History
OpenedLine 11: 28 June 2016 (2016-06-28)
Line 6: 18 August 2020 (2020-08-18)
Line 12: 28 December 2024 (2024-12-28)
Services
Preceding station Shenzhen Metro Following station
Terminus Line 6 Xitou
Bitou
Terminus
Line 11 Houting
Terminus Line 12 Langxia
Location

Songgang station (simplified Chinese: 松岗站; traditional Chinese: 松崗; pinyin: Sōnggǎng; Jyutping: Cung4gong1; Cantonese Yale: Chùhnggōng) is an interchange station between Line 6, Line 11 and Line 12 of the Shenzhen Metro. Line 11 platforms opened on 28 June 2016, Line 6 platforms opened on August 18, 2020 and Line 12 platforms opened on 28 December 2024.[1]

Station layout

G - Exits
B1F
Concourse
Lobby Ticket Machines, Customer Service, Shops, Vending Machines
B2F
11 Platforms
Platform 11 towards Bitou (Terminus)
Island platform, doors will open on the left
Platform 11 towards Huaqiang South (Houting)
B3F
6 Platforms
Side platform, doors will open on the right
Platform 6 towards Science Museum (Xitou)
Platform 6 termination platform
Side platform, doors will open on the right
B4F
12 Platforms
Side platform, doors will open on the right for alighting only
Platform 12 towards Zuopaotai East (Langxia)
Island platform, doors will open on the left or right for boarding only
Platform 12 towards Zuopaotai East (Langxia)
Side platform, doors will open on the left for alighting only

Entrances/exits

The station had 6 points of entry/exit (A, C, D, E, F, G) when Line 6 and Line 11 opened. When Line 12 opened, 3 new points of entry/exit were constructed (H, K, L). The entrances for both parts are not connected. The station has bus stops at Exits C and G. Exits C, G, H and K are accessible via elevators.

  • A: Bao'an Boulevard
  • B: Bao'an Boulevard (not open)
  • C: Bao'an Boulevard, Shajiang Road
  • D: Xitou Industrial 4th Road
  • E: Bao'an Boulevard
  • F: Bao'an Boulevard
  • G: Shajiang Road
  • H: Shajiang Road
  • J: Shajiang Road (not open)
  • K: Shajiang Road
  • L: Shajiang Road

References

  1. ^ "站点查询". Shenzhen Metro. 2020-08-05.