Airport East station

Airport East

机场东
Line 1 station exterior (January 2022)
Chinese name
Traditional Chinese機場東
Simplified Chinese机场东
Transcriptions
Standard Mandarin
Hanyu PinyinJīchàng Dōng
Yue: Cantonese
Yale RomanizationGēichèuhng Dūng
JyutpingGei1coeng4 Dung1
General information
LocationIn the green area between Hangzhan 4th Road and Bao'an Avenue
Fuyong Subdistrict, Bao'an District, Shenzhen, Guangdong
China
Coordinates22°39′00″N 113°49′03″E / 22.65°N 113.817611°E / 22.65; 113.817611
Operated bySZMC (Shenzhen Metro Group)
Shenzhen Line 12 Rail Transit Co., Ltd (Shenzhen Metro Group and PowerChina PPP)
Lines
Platforms4 (2 side platforms and 1 island platform)
Tracks4
Construction
Structure typeElevated (Line 1)
Underground (Line 12)
AccessibleYes
Other information
Station code101 (Line 1)
1215 (Line 12)
History
OpenedLine 1: 15 June 2011 (2011-06-15)
Line 12: 28 November 2022 (2022-11-28)
Services
Preceding station Shenzhen Metro Following station
Terminus Line 1 Hourui
towards Luohu
Fuwei
towards Songgang
Line 12 Xingwei
Track layout
1
2
Location

Airport East station (simplified Chinese: 机场东站; traditional Chinese: 機場東站; pinyin: Jīchàng Dōng Zhàn; Jyutping: Gei1 Coeng4 Dung1 Zaam6; Cantonese Yale: Gēichèuhng Dūng Jaahm) is an interchange station for Line 1 and Line 12 of Shenzhen Metro in Shenzhen, Guangdong Province, China. Line 1 platforms opened on 15 June 2011 and Line 12 platforms opened on 28 November 2022.[1][2]

History

Since Terminals A and B at Shenzhen Bao'an International Airport have closed and been replaced by Terminal 3 in November 2013, this metro station no longer serves the airport. Bus number M417, which used to connect this station to the airport, has been suspended and replaced with limited service by bus M5. Passengers for the airport should alight at the Airport station on Line 11 to reach the new terminal.

Station layout

3F
1 Platforms
Side platform, doors will open on the right
Platform 1 termination platform
Platform 1 towards Luohu (Hourui)
Side platform, doors will open on the right
2F
Concourse
Lobby of Line 1
G
Concourse
Lobby of Line 1 Exit, Ticket Machines, Customer Service
B1F
Concourse
Lobby of Line 12 Ticket machines, Customer Service
B2F
12 Platforms
Platform 12 towards Songgang (Fuwei)
Island platform, doors will open on the left
Platform 12 towards Zuopaotai East (Xingwei)

Entrances/exits

The Line 1 station has 2 points of entry/exit, of which 2 other ones (original Exits C and D) were demolished for Line 12 construction. The Line 12 station has 2 points of entry/exit, with Exit D being accessible via elevator. Both are temporary, and will be demolished when the transportation hub is completed.

Exit Destination
Exit A Jichang 6th Road (N), Hangzhan 4th Road (E)
Exit B Taxi, Shuttle Bus to Terminal 3, Bao'an Boulevard
Exit C Hangzhan 4th Road (N)
Exit D Hangzhan 4th Road (S), Jichang 6th Road (S)

Line 1

Line 12

References

  1. ^ "Shenzhen Metro Line 12 and Addition to Line 6 Open Today". Now Shenzhen. 28 November 2022. Retrieved 1 July 2024.
  2. ^ "Shenzhen metro surpasses 500km as Chinese networks expand". International Railway Journal. 6 December 2022. Retrieved 1 July 2024.