Longzexi station

Longzexi

龙泽西
Eastbound platform
Chinese name
Simplified Chinese龙泽西站
Traditional Chinese龍澤西站
Transcriptions
Standard Mandarin
Hanyu PinyinLóngzéxī zhàn
General information
LocationIntersection of Longyu East 1st Road (龙域东一路) and Huichuang Road (回创路),[1] Huilongguan Subdistrict
Changping District, Beijing
China
Coordinates40°04′17″N 116°18′06″E / 40.0713°N 116.301781°E / 40.0713; 116.301781
SystemBeijing Subway station
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line     Line 18
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
  •      Line 18: December 27, 2025 (2025-12-27)
  •      Line 13: December 2027 (2027-12) (expected)
  •      Line 19: December 2029 (2029-12) (planned)
Previous namesLongyu (龙域), Xinlongze (新龙泽), Beijiaonongchang Qiao (北郊农场桥)
Services
Preceding station Beijing Subway Following station
Dongbeiwang
towards Malianwa
Line 18 Huilongguan Xidajie
Future services
Xi'erqi Line 18
Opening 2027
Huilongguan Xidajie
Location
Longzexi
Location in Beijing

Longzexi station (simplified Chinese: 龙泽西站; traditional Chinese: 龍澤西站; pinyin: Lóngzéxī zhàn) is a station on Line 18 and the new Line 13 of the Beijing Subway. The Line 18 section opened on December 27, 2025, whilst the new Line 13 section is expected to open in December 2027. In the future, it will feature interchanges with Line 19 and BCR Northeast Ring line.[2][3]

Location

The station is located under the intersection of Longyu East 1st Road and Huichuang Road,[1] in Huilongguan Village,[4][5] Huilongguan Subdistrict, Changping District.

Station features

Lines 13 & 18

The station has two underground island platforms for Line 18 in its initial opening phase (which will combine to create a new Line 13 and re-routed Line 18 in 2027).[6]

Line 19

Another underground island platform for Line 19 (North extension) is expected to open in 2029.

Exits

The station has 5 exits.[7] Exits A, B, D and E opened with the station on December 27, 2025.[8] Exit C is still under construction. Exits F and G will open after the Line 19 station opens.

History

The station was previously named as Xinlongze station (Chinese: 新龙泽站; pinyin: Xīnlóngzé zhàn). On November 10, 2022, construction of the first ground wall of the station of the station officially started.[9]

On March 20, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the naming plan for the expansion and upgrading project of Line 13, and planned to name the station as Longyu station (Chinese: 龙域站; pinyin: Lóngyù zhàn).[10]

In May 2025, the station was included in the 03-contract section of civil construction of the second phase of Line 19 (North Extension and North Extension Branch).[11]

On August 18, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the station is officially named as Beijiaonongchang Qiao station (Chinese: 北郊农场桥站; pinyin: Běijiāonóngchǎng Qiáo zhàn), named after Beijiao Farm Bridge on Jingzang Expressway.[12]

On December 4, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the station is renamed as Longzexi station (Chinese: 龙泽西站; pinyin: Lóngzéxī zhàn).[13]

References

  1. ^ a b "新龙泽站近期接驳项目(施工)". 北京市公共资源交易服务平台. 2025-08-27. 新建临时龙域东一路,南起龙域东一路现状路,北至现状万科临时道路,道路全长224米,实施横断面宽度为12米;新建临时回创路东起现状京藏高速辅路,西至临时龙域东一路,道路全长372米,实施横断面宽度为12米;另新建2条临时道路,道路全长约223米,与临时回创路及京藏高速辅路衔接,实现区域微循环,实施横断面宽度为7-8米
  2. ^ "北京轨道交通19号线二期工程(北延及北延支线)环境影响评价第二次公示" [Second Public Notice of Environmental Impact Assessment for Phase II Project of Beijing Subway Line 19 (North Extension and North Extension Branch)] (in Simplified Chinese). 2024-10-21. Retrieved 2025-06-08.
  3. ^ "北京市郊铁路东北环线(南口至光华路段)工程环境影响评价征求意见稿(修改版)公示" [Public Notice of the Draft Environmental Impact Assessment for the Northeast Ring Line of Beijing Suburban Railway (Nankou to Guanghualu Section) (Revised Version)] (in Simplified Chinese). 2025-03-14. Retrieved 2025-06-08.
  4. ^ "昌平区回龙观镇土地利用总体规划".
  5. ^ "回龙观镇土地利用总体规划图".
  6. ^ "北京地铁13号线扩能提升工程新龙泽站,将于年底转入主体结构施工" [The Xinlongze Station of Beijing Metro Line 13 capacity expansion and upgrading project will enter the main structure construction at the end of the year] (in Simplified Chinese). 2024-08-19. Retrieved 2025-06-14.
  7. ^ "追溯ID:3213". 新龙泽站站位设置京藏高速西侧,规划龙域东一路与规划回创路的路口。车站规划设置5个出入口,规划龙域东一路与规划回创路交叉口的四个象限均有设置。A出入口设置于西北象限,沿规划龙域东一路设置;B出入口设置于东北象限,沿规划回创路布置;C出入口设置于东南象限;D出入口设置于西南象限,沿规划龙域东一路布置;E出入口设置于西南象限,沿规划回创路布置。
  8. ^ "180余名建设者坚守北京轨道交通新龙泽站". 2025-10-02.
  9. ^ Beijing Construction Engineering Co., Ltd. (2022-11-16). "【学习贯彻党的二十大精神】北京地铁13号线04标项目顺利开工!" [[Study and implement the spirit of the 20th National Congress of the Chinese Communist Party] Beijing Subway Line 13 Section 04 project started smoothly!] (in Simplified Chinese). Retrieved 2025-06-08.
  10. ^ "关于轨道交通13号线扩能提升工程车站命名预案的公示(公示期限7天)" [Publicity on the naming plan for the station of Metro Line 13 capacity expansion and upgrading project (publicity period 7 days)] (in Simplified Chinese). 2025-03-20. Retrieved 2025-06-08.{{cite web}}: CS1 maint: deprecated archival service (link)
  11. ^ "北京轨道交通19号线二期工程(北延及北延支线)土建施工03合同段施工资格预审公告" [Announcement on the Prequalification of Construction Contract Section 03 of the Second Phase of Beijing Metro Line 19 (North Extension and North Extension Branch) Civil Construction] (in Simplified Chinese). Beijing Engineering Construction Bidding and Tendering Transaction System. 2025-05-09. Retrieved 2025-06-08. 包括1站1区间(新龙泽站、西三旗站~新龙泽站区间) [Includes 1 station and 1 section (Xinlongze Station, Xisanqi Station ~ Xinlongze Station section)]
  12. ^ "地名公告". 2025-08-18. Retrieved 2025-08-19.{{cite web}}: CS1 maint: deprecated archival service (link)
  13. ^ "关于轨道交通"北郊农场桥站"更名预案的公示(公示期限7天)". 北京市规划和自然资源委员会. 2025-12-04. 根据《地名管理条例》和《北京市地名管理办法》等有关规定,为了更好体现区域经济社会发展的新要求,进一步发挥轨道微中心辐射带动作用,昌平区人民政府拟申请轨道交通"北郊农场桥站"进行更名,车站更名预案为"龙泽西站"{{cite web}}: CS1 maint: deprecated archival service (link)
  • Media related to Longzexi Station at Wikimedia Commons