List of power stations in Madagascar
The following page lists all power stations in Madagascar. The list is not complete. You can assist by adding relevant referenced content.
Hydroelectric
Operational
| Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
|---|---|---|---|---|---|---|---|
| Andekaleka Hydroelectric Power Station | Andekaleka | Vohitra River | Gravity | N/A | 91 MW | 1982, 2012 | |
| Antelomita Hydroelectric Power Station | Anjeva Gara | Ikopa River | Gravity | N/A | 8.4 MW | 1930, 1952, 1953 | |
| Farahantsana Hydroelectric Power Station | Mahitsy[1] | Ikopa River | Gravity | N/A | 28 MW | 2022 | |
| Mandraka Power Station | Mandraka | Mandraka River | Gravity | Lake Mandraka | 24 MW | 1956 | |
| Ankevirato Hydroelectric Power Station[2] | Tsarazaza | Rianamboa River | Gravity | 560 kW | 2023 |
Under construction
| Hydroelectric station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of owner | Notes | |
|---|---|---|---|---|---|---|---|---|
| Volobe Hydroelectric Power Station | Ambodilazana | water power | 120 MW | 2027 | Compagnie générale d’hydroélectricité de Volobe (CGHV)[3] |
Proposed
| Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
|---|---|---|---|---|---|---|---|
| Antetezambato Central[4] | Ambatofinandrahana District | under construction, previewed 2030 | Mania[5] | Gravity | 20°14′S 46°37′E / 20.233°S 46.617°E | 140 MW[6] | (projected 2030) |
| Sahofika Hydroelectric Power Station[7] | Sahofika | Onive River | Gravity | Sahofika Reservoir | 205 MW[7] | 2024 (expected) | |
| Antananarivo Mixed Hydrosolar Power Station[8] | Antananarivo | Run of river | N/A | 35 MW[8] | 2026 (expected) | ||
| Ranomafana Hydroelectric Power Station | Ranomafana (95 km northwest of Antananarivo)[9] | -18°36’35.9S,47°1’13.27 E | Ikopa River[10] | Gravity | 2×32 MW = 64 MW[11] | 202? (expected) |
Thermal
Operational
| Thermal power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of owner | Notes |
|---|---|---|---|---|---|---|---|
| Ambohimanambola Thermal power station | Ambohimanambola[12] | Heavy fuel oil | 105 MW[13] (7×15 MW) | 2024 | Jirama (state financed) | operated by Aksaf Power[14] | |
| Mandroseza Power Plant | Antananarivo | Heavy fuel oil | 40 MW[15] | 202? | Symbion Power Mandroseza SA[16] | ||
| Noor I Thermal Power Station[15] | Antananarivo | Heavy fuel oil | 48 MW[15] | 2018 | Jovena | ||
| Noor II Thermal Power Station[15] | Antananarivo | Heavy fuel oil | 28 MW[15] | 2018 | Jovena | ||
| Andaingo Thermal Power Station[17] | Andaingo | Biomass | 75 MW[17] | 2012 | CIRAD |
Solar
| Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of owner | Notes |
|---|---|---|---|---|---|---|---|
| Ambatolampy Solar Power Station | Ambatolampy | Solar | 40 MW | April 2022 | Ambatolampy Solar Consortium | ||
| Access Solar Power Station[18] | Antananarivo | Solar | 25 MW[18] | 2025 Expected | Access Power | ||
| Centrale Solaire d’Andranotakatra | Belobaka, Mahajanga II[19] | 12 MW Solar central | Solar | 1.25 MW | 2022 | ||
| Centrale Solaire d’Ambavahadinilakaka (Ihorombe) | Ambavahadinilakaka[20] | 470 kW Solar central | Solar | 470 kW | 2022 | Maherlla | |
| Mangatany | RIA Antananarivo[21] | Solar | 9,5 MW | Dezember 2025 | Jirama | 2.5 MW operational | |
| Sambava Solar Power Station | Sambava[22] | Solar | 500 kW | March 2022 | Green Energy Solutions |
Hybride
| Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of owner | Notes |
|---|---|---|---|---|---|---|---|
| Ambanja[23] | Ambanja | Solar+ fuel generators (hybride) | 825 kWc | August 2025 | |||
| Kimony Solar Hybride Central | Bemanonga, Menabe | Solar + thermal | 1.4 MW operative, 3 MW projected[24] | 2022 (1.4 MW operative) | Green Energy Solutions (GES) + Jirama | ||
| Sava Hybride Power Station | Sambava, Antalaha, Vohemar[25] | Solar + thermal | 8 MW thermal + 5 MW solar | Green Yellow | |||
| Tanambao Verrerie Solar-hybride central | Tanambao Verrerie, Toamasina | Solar + thermal | 18 MW | 2021 | Jirama | ||
| Toliara Centrale Energetique | Besinjaka (Tulear)[26] | Thermal + solar | 9 MW thermal + 2.9 MW solar | Filatex Energy |
See also
- List of largest power stations in the world
- List of power stations in Africa
- Jirama - the state's power supply company
References
- ^ MADAGASCAR : la centrale hydroélectrique de Farahantsana (28 MW) entre en service
- ^ commune-rurale-de-tsarazaza
- ^ Jirama achetera la production de Volobe
- ^ Centrale d'Antetezambato
- ^ www.ore.mg
- ^ 2424.mg
- ^ a b Jean Marie Takouleu (26 May 2020). "Madagascar: ADF supports Sahofika hydropower project with a €4 million loan". Paris: Afrik21.africa. Retrieved 16 September 2020.
- ^ a b Boris Ngounou (29 August 2019). "Madagascar: 35 MW hydroelectric power plant in project in Antananarivo". Paris: Afrik21.africa. Retrieved 16 September 2020.
- ^ La-centrale-hydroelectrique-de-Ranomafana-Ikopa-
- ^ meh.mg
- ^ Délestage: quelques années à tenir
- ^ Nouvelle Centrale Thermique à Ambohimanambola
- ^ 105 mw plant
- ^ Panne des Groupes de la Jirama
- ^ a b c d e Towerco of Madagascar (30 January 2018). "Jovena: Two new 76 MW thermal power stations planted" (Translated from the original French language). Antananarivo: Towerco of Madagascar. Retrieved 15 September 2020.
- ^ Symbion
- ^ a b CIRAD (April 2013). "Decentralized rural electricity distribution: the first thermal power station using biomass in Madagascar". Paris: CIRAD. Retrieved 16 September 2020.
- ^ a b Access Power (September 2020). "Access Power: Our Projects In Madagascar". Dubai: Access Power. Retrieved 16 September 2020.
- ^ Rajoelina a Boeny
- ^ HAZAVANA HO AN’NY REHETRA POUR LA COMMUNE D’IHOSY
- ^ Mangatany injecte ses premiers mégawatts sur le RIA
- ^ www.egedec.com
- ^ Nouvelle centrale solaire à Ambanja
- ^ centrale-solaire-hybride-de-Morondava
- ^ PV Magazine
- ^ Energie à Toliara
External links
- Mini-Grid Market Opportunity Assessment: Madagascar as of March 2019