Jinkeng station
Platform 2 | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 金坑站 | ||||||||||||
| Traditional Chinese | 金坑站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Guangshan Highway, Huangpu District, Guangzhou, Guangdong China | ||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
| Line | Line 21 | ||||||||||||
| Platforms | 4 (2 island platforms) | ||||||||||||
| Tracks | 4 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Elevated | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 2112 | ||||||||||||
| History | |||||||||||||
| Opened | 20 December 2019 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Jinkeng station (Chinese: 金坑站) is an elevated station of Line 21 of the Guangzhou Metro. It started operations on 20 December 2019.[1]
On 17 December 2019, Jinkeng Station was awarded the "Three-star Green Building Design Mark Certificate" by the Department of Housing and Urban-Rural Development of Guangdong Province, reaching the highest level in China's green building evaluation standards and becoming the first city rail transit line in mainland China to have a station that has obtained this certificate.[2]
The station has 2 elevated island platforms, numbered 1 & 2 on the inside, and 3 & 4 on the outside. Trains usually stop at the middle 2 platforms (platforms 1 and 2), with the express trains also passing through the middle tracks.
Exits
There are 2 exits, lettered A and B. Both exits are accessible and are located on Guangshan Highway.
Gallery
-
Platform 3
-
Concourse
-
Exit A
-
Exit B
-
Exterior
References
- ^ "二十一号线真的官宣来啦!". 19 December 2019.
- ^ "国内首个绿色建筑三星认证地铁站落户广州地铁二十一号线". Yangcheng Evening News. 2019-12-17.