Line 13 (Guangzhou Metro)

Line 13
A train of Guangzhou Metro Line 13
Overview
Other namesM9 (2000 plan name)
M13 (2013 plan name)
East–West express line (东西快线)
StatusPhase 1 operational, Phase 2 under construction
OwnerCity of Guangzhou
LocaleZengcheng, Huangpu and Tianhe districts
Guangzhou, Guangdong
Termini
Stations15
Service
TypeRapid transit
System Guangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Daily ridership127,800 (2017 daily average)[1]
History
Opened28 December 2017 (2017-12-28)
Technical
Line length36.9 km (22.9 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)
Route map

future extension
Chaoyang
Jingguang HSR
 
Qingfeng
Huanggang Stabling Yard
Huanggang
Chatou Depot (Line 12)
connection to Line 12
Xizhou
 12 
 12  to Xunfenggang
Chalong
Songxi
Luochongwei
Zengbu River
 5  to Jiaokou
Xichang
 5 
Guangzhan HSR
 
 11  Outer Circle
Caihong Bridge
 8   11   22 
 8 
to Wanshengwei
to Jiaoxin
 22  to Airport North (Terminal 2)
 11  Inner Circle
Sun Yat-sen Memorial Hall
 24 
 2 
to Guangzhou South Railway Station
to Jiahewanggang
Cangbian Road
Jianshe 6th Road
 5   12 
 5  Taojin
Nonglin Lower Road
 6 
to Xunfenggang
to Xiangxue
Meidong Road
 1  to Xilang
 10  to Xilang
 3 
to Haibang
to Airport North
Huacheng Square North
 1   3  Tiyu Xilu  10  Tianhe Road
 APM 
to Canton Tower
to Linhexi
Xiancun
 18 
 18 
to Wanqingsha
to Huachengjie
Shipai South
Machang
Baimagang
 11  Outer Circle /  21  to Zengcheng Square
Tianhe Park
 11   21 
 11  Inner Circle
connection to Line 11
Tangxia
Chebei
 4 
 4  to Huangcun
Tianhe Zhucun
Yuzhu Depot (Line 5)
Yuzhu Stabling Yard
Yuzhu
 5   28 
 28  to Luzhou
Yufengwei
 7 
 7 
to Meidi Dadao
to Yanshan
Shuanggang
Nanhai God Temple
Xiayuan
 5 
Huangpu New Port Special Line
 
Nangang
 THP2 
Nangangchong
 THP2  to Xiangxue
Shacun
Baijiang
connection to Line 16
Xintang
 16   28 
 16  to Lichengbei
 28  to Songshanhu
Guangzhou–Shenzhen railway
Guangzhou–Shantou Railway
Guanhu
Guanhu Depot
Xinsha
reserved extension
Line 13
Simplified Chinese广州地铁13号线
Traditional Chinese廣州地鐵13號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Shísān Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 sap6saam1 hou6 sin3

Line 13 of the Guangzhou Metro is a rapid transit rail line currently in operation as of 28 December 2017 in Guangzhou, China. It is envisioned to be the "East West express line" complementing Line 3 which is the "North South express line". The line serves some of the most popular areas in Guangzhou such as Luochongwei Bus Terminal, Zhujiang New Town CBD and Yuancun while passing through some of the densest and most populated areas of Tianhe, Yuexiu, and Liwan Districts. Due to the density of the areas served, demand for this line is expected to be high, with an average mature daily ridership predicted at 1.44 million passengers per day when both phases are complete. Knowing this, engineers designed Line 13 to use 8 car wide body Type A rolling stock, the highest capacity rolling stock in the Guangzhou Metro to date. To fulfill its role as a crosstown express service, the line is designed with a service speed of 100 km/h (62 mph) with a wider stop spacing.[2] The first phase runs from Yuzhu in Huangpu to Xinsha in Zengcheng, opened on 28 December 2017[3] and is expected to initially serve 220,000 riders per day.[2] Phase 2 of the line, from Yuzhu to Chaoyang, opened between Yuzhu and Tianhe Park on 29 September 2025.[4] The remaining section between Tianhe Park and Chaoyang is still under construction and will open in 2026.[5]

History

Segment Commencement Length Station(s) Name
Yuzhu — Xinsha 28 December 2017 25.61 km (15.91 mi) 11 Phase 1
Tianhe Park – Yuzhu 29 September 2025[4] 8.6 km (5.34 mi) 4 Phase 2 Initial Section

Planning

During initial planning, Line 13 considered the use of 4 car L-type light metro trains for operation. However, severe congestion issues appeared just after the opening of Line 3, which only uses low capacity 3 car Type B trains and Line 6 which uses even lower capacity 4 car Type L light metro trains, prompted heavy public criticism. Planners subsequently reevaluated the passenger flow forecasts for the entire line of Line 13, and upgraded the design to directly use the highest capacity 8 car A-type trains.

During 2012, it has also considered the split of the second phase of Line 13 between Tianhe Park and Tangxia, so that Line 13 can be operated in segments with two stations as the terminal and transfer station, passengers would transfer between the two lines using a paired cross-platform interchange.[6] At that time the predicted maximum passenger demand section of Line 13 was predicted to reach up to 55,000 pphpd heading eastbound beyond Tianhe Park station in the AM peak period. It was surmised that doubling up the line in that section will allow for additional capacity.[6] However, this plan was ultimately never adopted.[7]

In 2017, the second phase of the project (including the first phase of extension) was approved by the National Development and Reform Commission.[8] On 15 October, the Guangzhou Development and Reform Commission officially approved the feasibility study report of the second phase of Line 13. Initial ridership of Line 13 upon the opening of both phases is expected to reach 1.2 million passengers per day.[9]

Stations

Station
No.
Station name Connections Distance
km
Location
English Chinese
1320 Tianhe Park 天河公园  11  1104  21  2102 Tianhe
1321 Tangxia 棠下
1322 Chebei 车陂  4  423
1323 Tianhe Zhucun 天河珠村
1324 Yuzhu 鱼珠  5  521 0.00 0.00 Huangpu
1325 Yufengwei 裕丰围  7  713 2.64 2.64
1326 Shuanggang 双岗 GBRT 2.23 4.87
1327 Nanhai God Temple 南海神庙 GBRT 2.61 7.48
1328 Xiayuan 夏园  5  527
GBRT
2.18 9.66
1329 Nangang 南岗 2.88 12.54
1330 Shacun 沙村 3.63 16.17 Zengcheng
1331 Baijiang 白江 3.27 19.44
1332 Xintang 新塘 NUQ  SS  1.44 20.88
1333 Guanhu 官湖 3.41 24.29
1334 Xinsha 新沙 1.32 25.61

Phase II (remaining section)

  • Under Construction
Station
No.
Name Connections Future Connections Location
English Chinese
1319 Baimagang 白马岗 Tianhe
1318 Machang 马场
1317 Shipai South 石牌南
1316 Xiancun 冼村  18  1808
1315 Huacheng Square North 花城广场北  1   3  (via Tiyu Xilu 114 311)
 APM  (via Huangpu Dadao APM06)
 10  (via Tianhe Road)
1314 Meidong Road 梅东路 Yuexiu
1313 Nonglin Lower Road 农林下路
1312 Jianshe 6th Road 建设六马路 Taojin:  5  508  12  1214
1311 Cangbian Road 仓边路
1310 Sun Yat-sen Memorial Hall 纪念堂  2  214  24 
1309 Caihong Bridge 彩虹桥  8  811  11  1116  22  Liwan
1308 Xichang 西场  5  504
1307 Luochongwei 罗冲围 Baiyun
1306 Songxi 松溪
1305 Xizhou (Line 13)
(temporary name)
西洲(13号线)
1304 Xizhou 西洲  12  1203
1303 Huanggang 凰岗
1302 Qingfeng 庆丰
1301 Chaoyang 朝阳

References

  1. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf Archived 2021-12-20 at the Wayback Machine
  2. ^ a b 广州地铁 全程为你--公司新闻. gzmtr.com. Retrieved 2016-12-21.
  3. ^ Ltd, DVV Media International. "Four lines open as Guangzhou metro expands". Metro Report. Retrieved 22 May 2018.
  4. ^ a b 李天研 (28 September 2025). "广州地铁官宣:3条(段)城际铁路2条(段)地铁9月29日开通" [Guangzhou Metro officially announced: 3 intercity railway lines (sections) and 2 subway lines (sections) will open on 29 September]. Guangzhou Daily. Retrieved 28 September 2025.{{cite news}}: CS1 maint: deprecated archival service (link)
  5. ^ 详细页. www.gzggzy.cn. Archived from the original on 21 December 2016. Retrieved 21 December 2016.
  6. ^ a b Ruan, Ying. "广州轨道交通13号线线路拆分方案研究--《城市轨道交通研究》2012年08期". www.cnki.com.cn. 上海市: 城市轨道交通研究. ISSN 1007-869X. Archived from the original on 29 November 2014.
  7. ^ "广州建设工程交易中心". 26 August 2014. Archived from the original on 26 August 2014.
  8. ^ "广州市城市轨道交通第三期建设规划(2017-2023年)" (PDF). NDRC. Archived from the original (PDF) on 26 March 2017.
  9. ^ "广州地铁十三号线二期获"开工纸" 全线23站9站可换乘_南方快报_南方网". 16 October 2017. Archived from the original on 16 October 2017.