Ho Chi Minh City Metro Line 2

Line 2
Tuyến 2
L2
Overview
Other nameThủ Thiêm – Bến Thành – Tham Lương – Củ Chi
StatusUnder construction
OwnerHo Chi Minh City
LocaleHo Chi Minh City, Vietnam
Stations17 (under construction)
61 (planned)
Service
TypeRapid transit
System Ho Chi Minh City Metro
Operator(s)Management Authority of Urban Railways in Ho Chi Minh City (MAUR)
Depot(s)Tham Lương
History
Planned opening2030 - 2032 (planned)[1]
Technical
Line length17.5 kilometers (10.9 mi) (under construction)
62.2 kilometers (38.6 mi) (planned)
Route map

North-South Express Railway
Thủ Thiêm-Long Thành Light Rail
 Sông Tắc Bus Terminal
High Tech Park 
L10
01
Thủ Thiêm
02
Bình Khánh
Phong Phú 
L10
Cá Trê Canal
03
International Hospital
04
Young Pioneer Palace
Central Lake
05
Tố Hữu
 Thảo Điền – Tân Kiên 
L7
Saigon River
06
Hàm Nghi
 Suối Tiên Terminal
 Đông Thạnh
L4
Cần Giờ 
07
Bến Thành
Hiệp Phước 
L4
An Hạ 
08
Tao Đàn
 Hiệp Bình Phước – Tân Kiên 
L3
Đa Phước 
L8
09
Dân Chủ
 Bình Triệu
L9
Saigon station
10
Hòa Hưng
HCMC University of Technology 
L9
North - South Railway
 Tân Chánh Hiệp
L8
Saigon Locomotive Enterprise
11
Lê Thị Riêng
12
Phạm Văn Hai
13
Bảy Hiền
 Tân Cảng – New Cần Giuộc Bus Terminal 
L5
14
Nguyễn Hồng Đào
Âu Cơ 
L6 L9
15
Bà Quẹo
An Hạ 
L9
 Bình Triệu
L6
16
Phạm Văn Bạch
17
Tân Bình
Tham Lương - Bến Cát - Nước Lên Canal
 High Tech Park – Hồ Học Lãm 
L10
Tham Lương Depot
18
Tân Thới Nhất
19
Hưng Thuận
National Route 1
20
An Sương Bus Terminal
21
Quảng Đức
Nguyễn Ảnh Thủ Road
22
Tân Xuân
23
Bà Triệu
24
Lý Thường Kiệt
25
Thống Nhất
26
Tân Thới
27
Tân Hiệp
An Hạ Canal
28
An Hạ
 Bình Mỹ Depot
29
District Road 2
30
Tân Phú Trung
31
Lê Minh Nhựt
32
Tân Thông Hội
33
Trần Văn Chẩm
34
Huỳnh Văn Cọ
District Road 8
35
Củ Chi
36
Củ Chi Hospital
37
Nguyễn Thị Rành
38
Trung Viết
39
Cây Trôm
40
Phước Hòa
41
Phước Thạnh
42
Provincial Road 7
 Trảng Bàng (Tây Ninh)

Line 2 is an under construction rapid transit line of the Ho Chi Minh City Metro, Vietnam.[2][3] Line 2 is the city's second metro line, and will connect the former District 1 with District 2 to the east and District 12 and more further is Hóc Môn and Củ Chi to the northwest.[4] The construction's phase 1, known as Bến Thành – Tham Lương began in January 2026; and phase 2, known as Bến Thành – Thủ Thiêm began three months after, with an expected completion date for both phases in 2030.[5][6][7] The phase 1 length is 11.3-kilometer (7.0 mi) long with eleven stations and phase 2 is 6.2-kilometer (3.9 mi) six stations.[5]

The loan was to be provided by the Asian Development Bank (ADB), the German Development Bank (KfW), and the European Investment Bank (EIB).[4] The project's total cost is VNĐ47,900 billion (US$2.04 billion).[8] However, they later decided that the state budget would fund the project instead.[9]

Route

The metro western branch line, including phase 1 starts at Bến Thành station in Bến Thành, District 1, passes through Phạm Hồng Thái, Cách Mạng Tháng Tám, and Trường Chinh streets underground, and elevated at Tân Bình station at before turn left to ends at Tham Lương depot in District 12.[10] And for phase 3, from the Tân Bình station in Tân Bình district, the metro line continue to passes through National Route 22 in Hóc Môn, Củ Chi and ends at the border of the city with Tây Ninh province, all the stations and line of the phase are elevated. Both phases go to the northwest.

The eastern branch of the metro is the line phase 2, starts at Bến Thành station, passes underground of Hàm Nghi Boulevard and the Saigon River by a tunnel that parallel to the Saigon River Tunnel and continue to crosses the Mai Chí Thọ Boulevard then end at Thủ Thiêm station next to the An Phú intersection and the Rach Chiec National Sports Complex

Construction

The project comprises seven construction packages.[4]

  • CP0 package: Relocation of technical infrastructure system
  • CP1 package: The official building and auxiliary works at Tham Lương depot.
  • CP2 package: Infrastructure at Tham Lương depot.
  • CP3 package (including CP3a and CP3b): Tunnels and Underground stations.
  • CP4 package: Transition Structure, Viaduct and Elevated Station.
  • CP5 package: E&M system.
  • CP6 package: Track work.
  • CP7 package: Non-System E&M.

Stations

Station number Station name Layout Transfers Location
Total Current phase English name Vietnamese name Ward (current name after 2025 reform) Former district-level
1 N/a Thủ Thiêm Underground An Phú (Bình Trưng) Thủ Đức
2 N/a Bình Khánh Underground L10 (planned) An Khánh
3 N/a International Hospital Bệnh viện Quốc tế Underground An Lợi Đông (An Khánh)
4 N/a Young Pioneer Palace Cung Thiếu nhi Underground Thủ Thiêm (An Khánh)
5 N/a Tố Hữu Underground
6 N/a Hàm Nghi Underground Bến Nghé (Saigon) District 1
7 1 Bến Thành Underground Bến Thành
8 2 Tao Đàn Underground L3 (planned)
9 3 Dân Chủ Underground L8 (planned) Xuân Hòa District 3, District 10
10 4 Hòa Hưng Underground
Nhiêu Lộc, Hòa Hưng
11 5 Lê Thị Riêng Underground
12 6 Phạm Văn Hai Underground Tân Sơn Nhất, Tân Hòa, Bảy Hiền Tân Bình
13 7 Bảy Hiền Underground L5 (planned)
14 8 Nguyễn Hồng Đào Underground Tân Bình
15 9 Bà Quẹo Underground
  • L6 (planned)
  • L9 (planned)
Tân Bình, Tây Thạnh (of the former Tân Phú district)
16 10 Phạm Văn Bạch Underground Tân Sơn, Tây Thạnh (of the former Tân Phú district)
17 11 Tân Bình Elevated
18 N/a Tân Thới Nhất Elevated Tân Thới Nhất (Đông Hưng Thuận) District 12
19 N/a Hưng Thuận Elevated Đông Hưng Thuận
20 N/a An Sương Bus Terminal Bến xe An Sương Elevated Trung Mỹ Tây
21 N/a Quảng Đức Elevated
22 N/a Tân Xuân Elevated Tân Xuân (Hóc Môn) Hóc Môn
23 N/a Bà Triệu Elevated
24 N/a Lý Thường Kiệt Elevated Hóc Môn
25 N/a Thống Nhất Elevated Tân Thới Nhì (Xuân Thới Sơn)
26 N/a Tân Thới Elevated
27 N/a Tân Hiệp Elevated
28 N/a An Hạ Elevated Tân Phú Trung (Củ Chi) Củ Chi
29 N/a District Road 2 Hương lộ 2 Elevated
30 N/a Tân Phú Trung Elevated
31 N/a Lê Minh Nhựt Elevated
32 N/a Tân Thông Hội Elevated Tân Thông Hội (Củ Chi)
33 N/a Trần Văn Chẩm Elevated
34 N/a Huỳnh Văn Cọ Elevated
35 N/a Củ Chi Elevated Củ Chi Town (Tân An Hội)
36 N/a Củ Chi Hospital Bệnh viện Củ Chi Elevated Tân An Hội
37 N/a Nguyễn Thị Rành Elevated
38 N/a Trung Viết Elevated Phước Hiệp (Tân An Hội)
39 N/a Cây Trôm Elevated
40 N/a Phước Hòa Elevated
41 N/a Phước Thạnh Elevated Phước Thạnh (Thái Mỹ)
42 N/a Provincial Road 7 Tỉnh lộ 7 Elevated

*Station names in italic are not yet under construction

Rolling stock

The rolling stock has not been announced yet, and in February 2024, German company Siemens was in talks with the government to build urban rail lines, including Ho Chi Minh City Metro Line 2.[11] Line 2 will use electric multiple units. By 2030, it will use 3-car trains, then increase to 6 cars. Each train is 22 m long, 3.15 m wide, and 3.865 m high. Maximum axle load is 16 tons. The design speed is 90 km/h. Maximum operating speed is 80 km/h. The signaling system uses modern technology, ensuring scientific, efficient and safe train operation with automatic train control systems, automatic train monitoring, computer-based interlocking, train speed detection and measurement, data signal transmission, signal display system, depot signaling and interlocking system, disaster warning system and other auxiliary systems.[12]

On April 23, 2026, South Korean manufacturer Hyundai Rotem signed a contract worth 491 billion South Korean won with Vietnam's Thaco Group for the Line 2 project. With this contract, Hyundai Rotem has been selected as the manufacturer of driverless electric trains for Line 2.[13]

References

  1. ^ "TP Hồ Chí Minh dự kiến đưa vào khai thác tuyến Metro số 2 vào năm 2032". Báo Điện tử Đảng Cộng sản Việt Nam (VCP Online) (in Vietnamese). 2023-11-23. Retrieved 2025-01-26.
  2. ^ VnExpress. "HCMC's 2nd metro line awaits construction 12 years since approval - VnExpress International". VnExpress International – Latest news, business, travel and analysis from Vietnam. Retrieved 2022-10-18.
  3. ^ "Vietnam's Metro Rail Lines Lumber Toward Completion". thediplomat.com. Retrieved 2022-10-18.
  4. ^ a b c "The Metro Line 2". maur.hochiminhcity.gov.vn. Retrieved 2022-10-18.
  5. ^ a b Hoang, Lien. "Vietnam business hub breaks ground on Metro Line 2". Nikkei Asia. Retrieved 2025-04-28.
  6. ^ VietnamPlus (2022-03-02). "Completion schedule of HCM City Metro Line No.2 extended to 2030 | Society | Vietnam+ (VietnamPlus)". VietnamPlus. Retrieved 2022-10-18.
  7. ^ VnExpress. "HCMC shifts parking lot focus from underground to high above - VnExpress International". VnExpress International – Latest news, business, travel and analysis from Vietnam. Retrieved 2022-10-18.
  8. ^ "Metro line No. 2 completion deadline extended to 2030 in HCMC". theinvestor.vn. Retrieved 2024-11-22.
  9. ^ "HCMC to fund 2nd metro line with state budget instead of foreign loans". www.msn.com. Retrieved 2024-12-05.
  10. ^ "Phác họa hình hài tuyến metro số 2 TPHCM (Bến Thành – Tham Lương)". ashui.com. Retrieved 2024-11-22.
  11. ^ thanhnien.vn. "Metro số 2 TP.HCM: tin tức, hình ảnh, video, bình luận mới nhất". thanhnien.vn (in Vietnamese). Retrieved 2024-11-13.
  12. ^ ONLINE, TUOI TRE (2020-12-16). "Metro số 2 Bến Thành - Tham Lương tuyến metro xuyên tâm dài nhất TP.HCM". TUOI TRE ONLINE (in Vietnamese). Retrieved 2024-11-22.
  13. ^ "현대로템, 베트남 호치민 2호선 사업 첫 수주…"총 4910억 규모"". Newsis (in Korean). 23 February 2026.