Bukit Payung–Telemung Highway
Federal Route 250 | |
|---|---|
| Bukit Payung–Telemung Highway | |
| Route information | |
| Maintained by Malaysian Public Works Department | |
| Length | 15.5 km (9.6 mi) |
| Major junctions | |
| West end | Kuala Jeneris |
| FT 36 / FT 185 Second East–West Highway FT 247 Federal Route 247 East Coast Expressway FT 14 Federal Route 14 | |
| East end | Bukit Payong |
| Location | |
| Country | Malaysia |
| Highway system | |
Bukit Payung–Telemung Highway, Federal Route 250 is a major controlled-access highway in Terengganu, Malaysia. This highway is part of the Package 11 and 12 of the East Coast Expressway Phase 2 project (Jabur - Kuala Terengganu). This highway was opened to all traffic on 18 May 2012.
Features
At most sections, the highway was built under the JKR R5 road standard, allowing maximum speed limit of up to 90 km/h.
The sections between Kuala Jeneris junctions and Telemung-ECE intersection is under constructions.
On 29 August 2024, this highway is gazetted as Federal Route 250.[1][2][3]
Junction lists
The entire route is located in Terengganu.
Legend:
- I/C - Interchange, I/S - Intersection, RSA - Rest and service area, OBR - Overhead bridge restaurant, R/R - Restaurant and rest plaza, L/B - Layby, V/P - Vista point, TN - tunnel, T/P - Toll plaza, BR - Bridge
- C - Cloverleaf, S - Stack, T-A - Trumpet-A, T-B - Trumpet-B, DT - Directional-T/Y, SDT - Semi-Directional-T/Y, P-Y - Partial-Y, D - Diamond, P-C - Partial cloverleaf, D-D - Diverging diamond, D-R - Direct ramp
| District | Km | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|
| Through to FT 36 / FT 185 Second East–West Highway | |||||
| Hulu Terengganu | Kuala Jeneris I/C | FT 247 Malaysia Federal Route 247 – Besut, Setiu, Sungai Tong, Kuala Berang, Ajil | Junctions | ||
| 15.1 | Telemung-ECE I/C | East Coast Expressway – Kota Bharu, Kuala Terengganu, Setiu, Ajil RSA, Ajil, Kuantan, Kuala Lumpur | T-junctions | ||
| 11.1 | Kuala Telemung I/C | T9 Jalan Manir–Telemung–Tajin – Kuala Telemung, Manir, Kuala Berang | Diamond interchange | ||
| Hulu Terengganu–Kuala Terengganu district border | BR | Sungai Terengganu bridge | |||
| Kuala Terengganu | 8.6 | Pasir Tinggi I/C | T101 Jalan Pengadang Baru Pasir Tinggi – Pasir Tinggi, Serada, Alor Limbat | Parclo interchange | |
| 4.3 | BR | Sungai Kepong bridge | |||
| 3.7 | BR | Sungai Laca bridge | |||
| 0.2 | BR | Sungai Buaya bridge | |||
| 0.0 | Bukit Payung I/C | FT 14 Jerangau–Jabor Highway – Kuala Terengganu, Bukit Payong, Kuala Berang, Ajil, Bukit Besi, Kuantan T26 Jalan Bukit Payung–Rhu Rendang – Undang, Marang |
Junctions | ||
References
- ^ Fahrial; Andri Romanto (2020-08-06). "PENGARUH PENEMPATAN KARYAWAN TERHADAP KINERJA KARYAWAN PADA PABRIK KELAPA SAWIT 1 BUKIT PAYUNG KABUPATEN KUNTAN SINGINGI". DINAMIKA PERTANIAN. 34 (2). doi:10.25299/dp.2018.vol34(2).5427. ISSN 2549-7960.
- ^ McBrien, P.; Poulovassilis, A. "Data integration by bi-directional schema transformation rules". Proceedings 19th International Conference on Data Engineering (Cat. No.03CH37405). IEEE: 227–238. doi:10.1109/icde.2003.1260795.
- ^ Malaysia, AGC (2024-08-29). "Federal Roads (West Malaysia) (Amendment) (No.7) Order 2024". Malaysian Federal Legislation. Retrieved 2026-02-02.