Beijing Tongzhou railway station

Beijing Tongzhou

北京通州

West entrance
General information
Other namesBeijing Municipal Administrative Center railway station
Beijing Sub-Center railway station
LocationTongyun Subdistrict, Tongzhou District, Beijing
Coordinates39°54′08″N 116°42′08″E / 39.9021°N 116.7021°E / 39.9021; 116.7021
Owned byBeijing-Tianjin-Hebei Intercity Railway Investment Co., Ltd.
Operated by China Railway Beijing Group
Lines
Platforms6 island, 2 side
Connections Beiyunhedong station[1]
Construction
Structure typeunderground
Depth32 metres (105 ft)
History
Opened30 Dec 2025
Services
Transfer at Beiyunhedong station
Preceding station Beijing Subway Following station
Beiyunhexi
towards Jin'anqiao
Line 6
transfer at Beiyunhedong
Haojiafu
towards Luyang
Future services
Preceding station Beijing Subway Following station
Yunhe Shangwuqu
towards Dongdaqiao
Pinggu line
Opening 2026
Zhengwuzhongxin
towards Pinggu
Location
Beijing Tongzhou
Location in central Beijing

Beijing Tongzhou railway station[2][3][4][5] (Chinese: 北京通州站; pinyin: Běijīng tōngzhōu zhàn), also known as Beijing Municipal Administrative Center railway station and Beijing Sub-Center railway station,[6][7] is a railway station in Tongyun Subdistrict, Tongzhou District, Beijing. Construction of the Integrated Transportation Hub (ITH) started construction on 30 November 2019 (2019-11-30).[8]. It opened on 30 December 2025 (2025-12-30)[9]. It will be the largest underground railway station in Asia.[6]

The total site area of the Integrated Transport Hub is 70 hectares (170 acres), with a floorage of 2,230,000 square metres (24,000,000 sq ft) overground. The total investment of the Integrated Transport Hub is approximately 42.1 billion Renminbi.[10]

This station and the ITH are designed by AREP, Beijing General Municipal Engineering Design & Research Institute, China Railway Design Corporation, and China Architecture Design Group.[11]

Future development

The Pinggu line of the Beijing Subway is currently under construction and is expected to open in late 2026.[12][13]

See also

References

  1. ^ a b "北京:副中心枢纽站开工 2024年底通车". 2019-12-03. Archived from the original on December 3, 2019. 未来,枢纽站将与6号线北运河东站实现换乘
  2. ^ 裴剑飞; 王贵彬 (2025-12-26). "北京通州站12月30日开通,接入地铁6号线". 新京报. Archived from the original on 2025-12-26. Retrieved 2025-12-26.
  3. ^ 裴剑飞; 王贵彬 (2025-12-26). "从"集中"到"分流",北京"八站两场"格局即将形成". 新京报. Archived from the original on 2025-12-26. Retrieved 2025-12-26.
  4. ^ "北京城市副中心站,挂牌啦!".
  5. ^ "Nation Media Group of Shanghai Cooperation Organization (SCO) visits Beijing Municipal Administrative Center Station Hub". 2024-07-10.
  6. ^ a b China Railway (2022-11-16). "Asia's Largest Underground Transportation Complex Hub Enters New Construction Phase". china-railway.com.cn. Archived from the original on 2023-01-26. Beijing Sub-center Railway Station, is proceeding smoothly, as the construction work on the ground floor has started recently
  7. ^ "Beijing Sub-center Station to develop into five-rail interchange transportation hub".{{cite web}}: CS1 maint: deprecated archival service (link)
  8. ^ "Main structure of Asia's largest underground transportation hub completed". english.news.cn. Retrieved 2025-01-18.
  9. ^ Cheng, Yang (2025-12-31). "New Beijing rail station to be a major transport hub". China Daily. Retrieved 31 December 2025.
  10. ^ "Beijing to build sub-center transportation hub in Tongzhou". www.ecns.cn. Retrieved 2020-01-08.
  11. ^ "AREP wins the bid for overall design project for integrated transportation hub of Beijing sub-center station". Arep.fr - AREP Group. Retrieved 2020-01-08.
  12. ^ 北京地铁平谷线(22号线)北京段何时开工? [When will the Beijing Section of the Beijing Subway Pinggu Line (Line 22) start?] (in Chinese (China)). 2021-02-02. 地铁22号线朝阳段计划于春节后陆续实施拆改移工作,进行施工前的准备,计划2025年建成通车
  13. ^ 北京7条地铁线陆续开始铺轨 平谷线朝阳段和通州段已进场. 2021-04-07. Retrieved 2021-04-08.