Yamagata Shinkansen

Yamagata Shinkansen
E8 series set on a Tsubasa service at Kaminoyama-Onsen Station, June 2024
Overview
Native name山形新幹線
StatusOperational
Owner JR East
LocaleFukushima and Yamagata prefectures
Termini
Stations11
Color on map     Orange
Service
TypeMini-Shinkansen
ServicesTsubasa
Operator(s)JR East
Depot(s)Yamagata
Rolling stockE3 and E8 series
History
OpenedJuly 1, 1992 (1992-07-01)
Technical
Track length148.6 km (92.3 mi)
Number of tracks2, 1 in some sections
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line20 kV 50 Hz AC
Operating speed130 km/h (81 mph)
Maximum incline3.75%
Route map

0.0
Fukushima
Soneda
Tohoku / Abukuma lines
3.8
Sasakino
6.9
Niwasaka
No. 2 Yoshigasawa Tunnel
Matsukawa Tunnel
Higashi-Akaiwa (temp., 1st)
Higashi-Akaiwa (temp., 2nd)
Akaiwa
Until 1990
14.6
Akaiwa
Since 1990
Ohinata tunnel
Kankane tunnel
Itaya
Until 1990
21.2
Itaya
Since 1990
Itayatoge tunnels
24.5
Tōge
Since 1990
Toge
Until 1990
28.8
Ōsawa
Since 1990
Ōsawa
Until 1990
34.8
Sekine
40.1
Yonezawa
45.6
Oitama
49.9
Takahata
Yamako Takahata Line
56.1
Akayu
61.6
Kita-Akayu signal box
64.4
Nakagawa
68.3
Uzen-Nakayama
75.0
Kaminoyama-Onsen
77.8
Mokichi-Kinenkan-mae
81.8
Zaō
Yamagata Locomotive Depot
87.1
Yamagata
89.0
Kita-Yamagata
91.9
Uzen-Chitose
93.6
Minami-Dewa
94.9
Urushiyama
97.0
Takatama
98.3
Tendō-Minami
100.4
Tendō
103.4
Midaregawa
Yachikidō
106.3
Jimmachi
108.1
Sakurambo-Higashine
109.0
Kanisawa
Until 1999
110.6
Higashine
113.5
Murayama
117.9
Signal box
Until 1999
121.5
Sodesaki
Yamako Obanazawa Line
126.9
Ōishida
130.8
Kita-Ōishida
133.7
Ashisawa
140.3
Funagata
144.1
Torigoe signal box
Until 1999
148.6
Shinjō
Yamako Obanazawa Line

The Yamagata Shinkansen (Japanese: 山形新幹線) is a mini-Shinkansen route in Japan, operated by East Japan Railway Company (JR East). It provides service between Tokyo and Shinjō in Yamagata Prefecture over the tracks of the Tōhoku Shinkansen and the Ōu Main Line.

The term Yamagata Shinkansen refers to the segment that connects Fukushima and Shinjō. Because the Shinkansen trains share tracks with local trains running on conventional lines it is often referred to as a "mini-Shinkansen".

Operations

Trains consist of 7-car E3 and E8 series trainsets operating as Tsubasa services. Between Tokyo and Fukushima, most trains run coupled to Yamabiko limited-stop service trains on the Tōhoku Shinkansen. Between Fukushima and Shinjō, the trains run on their own at a maximum speed of 130 kilometres per hour (81 mph) and share the line with regular Ōu Main Line trains.[1]

As of July 2012, about 62 million passengers had ridden the line since it opened in July 1992.[2]

The fastest trains connect Tokyo and Yamagata stations in two hours and 29 minutes.[2]

Station list

Station Distance (km) Transfers Location
From Tokyo From Fukushima
Through service to/from Tokyo via the Tōhoku Shinkansen
Fukushima 272.8 0 Fukushima Fukushima
Prefecture
Yonezawa 312.9 40.1 Yonezawa Yamagata
Prefecture
Takahata 322.7 49.9 Takahata
Akayu 328.9 56.1 Nanyō
Kaminoyama-Onsen 347.8 75.0 Kaminoyama
Yamagata 359.9 87.1 Yamagata
Tendō 373.2 100.4 Tendō
Sakurambo-Higashine 380.9 108.1 Higashine
Murayama 386.3 113.5 Murayama
Ōishida 399.7 126.9 Ōishida
Shinjō 421.4 148.6 Shinjō

Rolling stock

As of March 2024, the following types are used on Yamagata Shinkansen services:

Former rolling stock

  • 400 series: 7-car sets (originally 6-car sets) withdrawn by 18 April 2010
  • E3-1000 series: 7-car sets, in service from 4 December 1999 until 18 March 2024.[4]

Non-revenue-earning-types

History

The tracks of the Ōu Main Line were re-gauged between 1988 and 1992 to create the Yamagata Shinkansen. Tsubasa services began on 1 July 1992, operating between Tokyo and Yamagata using six-car 400 series trainsets coupled to 200 series trains on the Tōhoku Shinkansen between Tokyo and Fukushima. On 1 December 1995, the trains were lengthened to seven cars, and the line was subsequently extended northward to Shinjō on 4 December 1999. All cars were designated non-smoking from 18 March 2007.

A major rolling stock transition occurred on 20 December 2008, when E3-2000 series trainsets entered service, replacing the earlier 400 series, which were fully withdrawn on 18 April 2010. Operations were severely disrupted following the 2011 Tōhoku earthquake and tsunami on 11 March 2011, which led to the suspension of all services. Partial operations resumed between Fukushima and Shinjō on 31 March 2011, and full through-services between Tokyo and Shinjō were restored on 12 April 2011, albeit at approximately half of the previous capacity.[5]

Services were disrupted on 13 February 2021, when operations north of Nasushiobara Station were suspended following the 2021 Fukushima earthquake.[6]

In March 2020, JR East announced two major projects to improve the line. The first was the introduction of the E8 series trains, designed to increase maximum speeds on the Tōhoku Shinkansen to 300 kilometres per hour (190 mph) and reflect the landscape and cultural identity of Yamagata Prefecture.[7] Delivery began in 2023 and is scheduled to conclude in 2026, when the E8 series will replace the remaining E3 series.[8][9] The second project is the construction of a new approach line at Fukushima Station to remove a bottleneck. Previously, southbound Yamabiko services coupling with Tsubasa trains had to cross the northbound main line twice to access Platform 14. The new track will branch from the Ōu Main Line, pass beneath the elevated Shinkansen, and connect directly to Platform 11, eliminating at-grade crossings and allowing simultaneous arrivals and departures, improving timetable flexibility. Completion is scheduled for 2026.[8][10][11]

On 9 June 2022, the line celebrated its 30th anniversary; an E3 series trainset was wrapped in a commemorative livery and remained in service until November 2022.[12]

The E8 series entered service on 16 March 2024.[3] On 17 June 2025, four E8 series trainsets experienced auxiliary power unit (APU) malfunctions.[13][14][15] The APU converts electricity collected from the overhead lines into the appropriate forms required by onboard systems, including traction motors and cooling equipment. Each trainset is equipped with two APUs to provide redundancy.[16][17]

The E8 series entered service on 16 March 2024.[3] On 17 June 2025, four E8 series trainsets suffered malfunctions of their auxiliary power units (APUs), which convert electricity from overhead lines for onboard systems.[13][14][15] In one case, a trainset stopped on the Tōhoku Shinkansen, blocking the line, stranding passengers, cancelling 86 services, and delaying 138 others across the Tōhoku, Yamagata, and Akita Shinkansen lines.[13][18][19] JR East suspended independent E8 operation, limiting them to multiple working and temporarily reinstating some E3 trains, reducing Yamagata Shinkansen service to roughly 80% of normal.[14][20][21] Investigations found that an electrical issue, combined with high summer temperatures, caused protective components to fail, allowing excess current to reach and damage sensitive electronic systems. After installing stronger protective components and revising settings, independent operation and through services gradually resumed from 1 August 2025.[22][21]

Future

Proposed Ou base tunnel

JR East has proposed the construction of a base tunnel through the Ōu Mountains west of Fukushima, with a surveyed route between Niwasaka and Sekine.[23] Of the proposed 24.9-kilometre (15.5 mi) line, 23.1 kilometres (14.4 mi) would be underground, located mostly north of the existing line, and follow a more direct alignment intended to reduce journey times by approximately 10 minutes through a proposed line speed of up to 200 kilometres per hour (120 mph).[24] The tunnel would bypass the Itaya Toge pass, where gradients of 3.0–3.8% and an altitude of 548 metres (1,798 ft) currently limit speeds to 55 kilometres per hour (34 mph) or less and leave the line vulnerable to heavy rain, snow, and high winds;[23] between 2011 and 2017, 410 Tsubasa services were delayed or suspended, 40% of which occurred on the Itaya Toge section.[23] If authorized at an estimated cost of ¥150 billion, detailed design would take five years and construction a further 15 years,[25] with an option to build the tunnel to the full Shinkansen loading gauge for an additional ¥12 billion.[23]

References

  1. ^ "300 km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine. Vol. 52, no. 612. Japan: Koyusha Co., Ltd. April 2012. p. 14.
  2. ^ a b "Yamagata Shinkansen Line turns 20". The Japan Times. Japan: The Japan Times Ltd. 3 July 2012. p. 2. Archived from the original on 25 July 2012. Retrieved 30 December 2013.
  3. ^ a b c "山形新幹線 25年ぶりの新型車両「E8系」営業運転開始" ["E8 series", begins revenue service, the first new vehicle on the Yamagata Shinkansen in 25 years]. NHK. 16 March 2024. Archived from the original on March 16, 2024. Retrieved 16 March 2024.
  4. ^ "E3系L53編成が新潟へ" [E3 series set L53 forwarded to Niigata]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 19 March 2024. Retrieved 19 April 2024.
  5. ^ NHK, "Yamagata Shinkansen fully resumes operations", 12 April 2011.
  6. ^ "Tohoku Shinkansen line breaks from the base of utility poles" (in Japanese). TBS News. 14 February 2021. Archived from the original on 14 February 2021. Retrieved 14 February 2021.
  7. ^ "山形新幹線をより便利に快適にします" [Make the Yamagata Shinkansen more convenient and comfortable] (PDF). jreast.co.jp. 東日本旅客鉄道株式会社. 3 March 2020. Archived (PDF) from the original on 3 March 2020. Retrieved 3 March 2020.
  8. ^ a b "JR East Announced New E8 Shinkansen Trains". Railvolution. Retrieved 2021-05-24.
  9. ^ "山形新幹線E3系つばさ、つなぐ.:JR東日本". www.jreast.co.jp (in Japanese). Archived from the original on 2025-06-15. Retrieved 2025-09-30.
  10. ^ "Wayback Machine" (PDF). 2021-05-24. Archived from the original (PDF) on May 24, 2021. Retrieved 2021-05-24. {{cite web}}: Cite uses generic title (help)
  11. ^ Kamishin, Daisuke (2020-03-03). "JR東日本、山形新幹線の福島駅アプローチ線新設工事" [JR East begins construction of a new approach line for the Yamagata Shinkansen at Fukushima Station]. news.mynavi.jp (in Japanese). Retrieved 2026-01-13.
  12. ^ "山形新幹線開業30周年を記念したラッピング車両を運転" [Driving a wrapping vehicle commemorating the 30th anniversary of the opening of the Yamagata Shinkansen]. Japan Railfan Magazine Online (in Japanese). 7 June 2022. Archived from the original on 7 June 2022. Retrieved 8 June 2022.
  13. ^ a b c "3 more bullet trains report issues after service halt in east Japan". Kyodo News. 18 June 2025. Retrieved 18 June 2025.
  14. ^ a b c 嶋田, 昭浩 (18 June 2025). "東北新幹線、新型「E8系」の単独運行を取りやめ 長時間の運転見合わせ、電源装置の故障が原因 JR東日本" [Tōhoku Shinkansen halts independent operation of new E8 series trains, malfunctioning power supply systems to blame for long-term suspension of operations — JR East]. Tokyo Shimbun Digital (in Japanese). Retrieved 29 June 2025.
  15. ^ a b "JR East: Power supply system malfunction likely caused E8 Shinkansen shutdown". NHK World-Japan. 18 June 2025. Archived from the original on June 18, 2025. Retrieved 18 June 2025.
  16. ^ "JR East: Shinkansen train power supply systems had damaged chips". NHK World-Japan. 25 June 2025. Archived from the original on June 29, 2025. Retrieved 29 June 2025.
  17. ^ 嶋田, 昭浩 (25 June 2025). "東北・山形新幹線E8系、補助電源装置の半導体に損傷 JR東日本「6台ともぐちゃぐちゃ、かつてない」" [Damage to auxiliary power unit semiconductors on Tōhoku, Yamagata Shinkansen E8 series; JR East: "6 units wrecked, unprecedented"]. Tokyo Shimbun Digital (in Japanese). Retrieved 29 June 2025.
  18. ^ 足立, 菜摘 (18 June 2025). "18日も東北・山形新幹線が一部運休 17日の車両故障の影響続" [Some Tōhoku and Yamagata Shinkansen services suspended on the 18th due to continuing impact of train malfunction on the 17th]. Asahi Shimbun Digital (in Japanese). Retrieved 18 June 2025.
  19. ^ "JR East investigating possible flaw in E8 series Shinkansen trains". NHK World-Japan. 18 June 2025. Archived from the original on June 18, 2025. Retrieved 18 June 2025.
  20. ^ "東北・山形新幹線E8系、電源装置の半導体が損傷 原因は不明" [Tōhoku, Yamagata Shinkansen E8 series power supply system semiconductor parts damaged, cause unknown]. The Nikkei (in Japanese). Kyodo News. 25 June 2025. Retrieved 29 June 2025.
  21. ^ a b "山形新幹線 現在の調査経過と当面の対応について" [Yamagata Shinkansen: Current investigation progress and countermeasures] (PDF) (Press release) (in Japanese). East Japan Railway Company. 25 June 2025. Retrieved 29 June 2025.
  22. ^ "山形新幹線「E8系」故障、原因を特定 想定より高い電流+気温上昇で半導体素子が損傷" [Yamagata Shinkansen "E8 series" malfunction: Cause identified as higher-than-expected current combined with rising temperatures damaging semiconductor components]. ITmedia NEWS (in Japanese). 23 July 2025. Retrieved 2026-01-13.
  23. ^ a b c d "Yamagata mini-Shinkansen base tunnel proposal makes progress". Railway Gazette International. 7 November 2022. Retrieved 12 November 2022.
  24. ^ "Yamagata pins hopes on shinkansen tunnel, but faces roadblocks". The Japan Times. 2023-01-23. Retrieved 2023-05-22.
  25. ^ "A 23 km tunnel planned on Yamagata Shinkansen – Difficult section with heavy snowing – [WTM] Railway & Travel News". 2022-11-14. Retrieved 2023-05-22.