Xichong station
Platform | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 溪涌 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Xichong Xihai Road (溪涌溪海路) Kuichong Subdistrict, Dapeng New Area, Shenzhen, Guangdong China | ||||||||||||
| Coordinates | 22°36′53.827″N 114°21′20.491″E / 22.61495194°N 114.35569194°E | ||||||||||||
| Operated by | SZMC (Shenzhen Metro Group) | ||||||||||||
| Line | Line 8 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2025 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Xichong station (Chinese: 溪涌; pinyin: Xīchōng; Jyutping: kai1 cung1; Cantonese Yale: Kāichūng) is a station on Line 8 of the Shenzhen Metro. It opened on 28 December 2025, with the Phase 3 extension of the line serving as its terminus station.[1][2][3] It is located under Xihai Road.
Xichong station was the one and only station on the Line 8 Phase III extension. Trial runs for Phase III and the station began on 1 November 2025.[4][5]
Station layout
| G | – | Exits A-D |
| B1F Concourse |
Lobby | Ticket Machines, Customer Service |
| B2F Platforms |
2 towards Chiwan (Xiaomeisha) | |
| Island platform, doors will open on the left | ||
| 8 termination platform | ||
Gallery
-
Concourse
-
Station art located in the middle and ceiling
Entrances/exits
The station has 4 points of entry/exit, with Exits B and C being accessible via elevators.
References
- ^ "Shenzhen metro line 8 extension brings 1st rail service to Dapeng". Shenzhen Government Online. 18 December 2025. Retrieved 31 December 2025.
- ^ "前所未有,工作日坐地铁去溪涌" [Unprecedented, taking the subway to Xichong on a weekday]. Shenzhen Press. 30 December 2025. Retrieved 1 January 2026.
- ^ "4 new Metro sections start service". Shenzhen Daily. 29 December 2025. Retrieved 1 January 2026.
- ^ Lian, Jiaqi. "Phase 3 of Metro Line 8 begins trial runs". SHENZHEN EYE. Retrieved 31 December 2025.
- ^ "2025深圳地铁8号线三期运营正式进驻" [The third phase of Shenzhen Metro Line 8 will officially commence operation in 2025.]. Bendibao (in Simplified Chinese). 3 November 2025. Retrieved 1 January 2026.