Western Gwinnett Bikeway

Western Gwinnett Bikeway
The bikeway in 2018
Length11 miles (18 km) completed
18 miles (29 km) planned total
LocationGwinnett County, Georgia, United States
Established2011
Trailheads
UseCycling, walking, and other non-motorized uses
SeasonYear-round
SurfaceAsphalt

The Western Gwinnett Bikeway (also known as the Western Gwinnett Pathway) is a multi-use trail along Peachtree Industrial Boulevard in Gwinnett County, Georgia, United States. The trail connects or will connect the cities of Norcross, Peachtree Corners, Berkeley Lake, Duluth, Suwanee, Sugar Hill, and Buford.[1]

The bikeway is designed as a 10–14 ft (3–4.3 m) wide separated multi-use path for cyclists and pedestrians.[2] It serves as a central spine for Gwinnett County's trail network, connecting neighborhoods, parks, schools, and commercial areas while promoting regional active transportation.[3]

The trail and related planning efforts are described in the Countywide Trails Master Plan, a comprehensive effort to guide future trail decision‑making, funding priorities, and collaborative development across Gwinnett County and its cities, providing a planning framework that local leaders and governmental agencies can reference when seeking funding or coordinating connectivity improvements.[4]

Route

The bikeway runs primarily along Peachtree Industrial Boulevard. Completed sections extend through Peachtree Corners and Duluth, with Phase III completed in December 2024 extending toward Suwanee.[5]

The bikeway connects to the Rogers Bridge pedestrian and bicycle crossing over the Chattahoochee River, linking Duluth with Johns Creek. The restored bridge replaced a historic 1912 structure and provides access to parks and trails on both sides of the river.[6]

Western Gwinnett Bikeway
mi
12.6
Buford (planned)
to/from
Sugar Hill Greenway
10.5
Sugar Hill
to/from
George Pierce Park
to/from
Sims Lake Park
to/from
Suwanee Creek Greenway
8.5
Suwanee
to/from
Bunten Road Park
to/from
Rogers Bridge Park
to/from
Chattahoochee River
to/from
Shorty Howell Park
5.0
Duluth
to/from
West Gwinnett Park & Aquatic Center
to/from
Pinckneyville Park
3.0
Berkeley Lake
1.5
Peachtree Corners
0
Peachtree Creek Greenway (planned connection)

Trail connections

The bikeway connects to several existing and planned trails, including:

At the DeKalb County line, the trail will link to the Peachtree Creek Greenway, a multi-use corridor running through Brookhaven, Chamblee, and Doraville, connecting suburban Gwinnett County to the metropolitan Atlanta trail network.[7]

Regional trail network

The bikeway is part of a regional plan by the Atlanta Regional Commission to develop a connected network of bicycle and pedestrian corridors linking Gwinnett County, northern suburbs, and central Atlanta.[8]

Through the Peachtree Creek Greenway, users will eventually access the Atlanta BeltLine and PATH400 greenway trail, forming continuous urban-suburban multi-use pathways.[9]

Trailheads and access

The Western Gwinnett Bikeway features multiple formal and informal trailheads to maximize accessibility for cyclists, pedestrians, and other non-motorized users. Trailheads are designed to comply with Americans with Disabilities Act (ADA) standards where feasible.[10]

Trailhead Location Coordinates Facilities / Notes
Rogers Bridge Park Duluth 34°00′19″N 84°09′59″W / 34.0052°N 84.1665°W / 34.0052; -84.1665 Parking, restrooms, connection to Rogers Bridge
Pinckneyville Park Peachtree Corners 33°57′50″N 84°13′06″W / 33.9638°N 84.2183°W / 33.9638; -84.2183 Parking, playground, trail access
West Gwinnett Park & Aquatic Center Duluth 34°00′31″N 84°10′49″W / 34.0085°N 84.1802°W / 34.0085; -84.1802 Parking, aquatic center, trail access
Suwanee Creek Greenway Trailhead Suwanee 34°02′47″N 84°05′06″W / 34.0465°N 84.0850°W / 34.0465; -84.0850 Parking, connection to local greenway
Peachtree Creek Greenway DeKalb County 33°55′53″N 84°15′54″W / 33.9313°N 84.2649°W / 33.9313; -84.2649 Planned connection to Atlanta trail network

History

The bikeway began development in the early 2010s to expand bicycle and pedestrian infrastructure. Early phases connected Duluth and Peachtree Corners. Phase III, completed in December 2024, extended the pathway toward Suwanee, adding approximately five miles of trail.[11]

Future planning and concerns

The bikeway will expand north toward Sugar Hill and Buford, with loop trails connecting parks, neighborhoods, and commercial areas. Spur trails will be leveraged to tie in surrounding streets for maximum walkability.

Key planning priorities include:

  • Improving multi-modal access to neighborhoods, schools, commercial areas, and parks.
  • Enhancing intersection safety and visibility with crosswalks, pedestrian islands, signage, and lighting.
  • Installing protective barriers, bollards, and vegetation buffers along high-speed segments.
  • Providing bicycle parking and pumps at key trailheads and along the route.
  • Installing outdoor gym equipment at trail access points.

Local residents have requested the addition of “Yield to Bikes and Pedestrians” signage and bright green pavement markings at locations where vehicles turn right across the elevated bikeway, particularly at T-shaped intersections with limited visibility. These enhancements are intended to improve driver awareness, reduce conflicts, and increase safety for cyclists and pedestrians. Supporters believe that clearer markings will make the bikeway more predictable and encourage greater use.

See also

References

  1. ^ "Western Gwinnett Pathway". Gwinnett County Government. Retrieved 15 March 2026.
  2. ^ "Western Gwinnett Bikeway to be extended soon". Gwinnett County Government. Retrieved 15 March 2026.
  3. ^ "Gwinnett trails master plan foresees network of pathways". Gwinnett Citizen. Retrieved 15 March 2026.
  4. ^ "Countywide Trails Master Plan". Gwinnett County Government. Retrieved 15 March 2026.
  5. ^ "County leaders unveil new Western Gwinnett Pathway". Gwinnett County Government. December 12, 2024. Retrieved 15 March 2026.
  6. ^ "CHA celebrates Project of the Year Award for Rogers Bridge". CHA Consulting. September 20, 2024. Retrieved 15 March 2026.
  7. ^ "Peachtree Creek Greenway". City of Brookhaven. Retrieved 15 March 2026.
  8. ^ "Bike and pedestrian planning". Atlanta Regional Commission. Retrieved 15 March 2026.
  9. ^ "Atlanta BeltLine trails". Atlanta BeltLine, Inc. Retrieved 15 March 2026.
  10. ^ "Americans with Disabilities Act Accessibility Guidelines". U.S. Access Board. Retrieved 15 March 2026.
  11. ^ "County leaders unveil new Western Gwinnett Pathway". Gwinnett County Government. December 12, 2024. Retrieved 15 March 2026.