Wardha–Nanded line
| Wardha–Yavatmal–Nanded line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Active | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Line length | 284 km (176 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track gauge | 5 ft 6 in (1,676 mm) broad gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Electrification | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Operating speed | 130 km/h | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wardha–Yavatmal–Nanded line, with 327 km long Wardha-Kalamb-Yavatmal-Digras-Pusad-Nanded alignment, is an under-construction railway line in Maharashtra state of India, which will connect Nagpur and other districts in Vidarbha with Nanded and other parts of Marathwada regions. It will reduce Wardha-Yavatmal passenger travel time from about 2 hours by road to approximately 1.5 hours by train. It will also provide evacuation of major produce of Vidharba, such as cotton, soybeans, and coal, to Marathwada.[1][2][3] It has been designated as the "special project" status by the Ministry of Railways, Government of India.[4][5]
History
Revised total project cost of 284 km new line was INR3445.34 crores in 2025,[6][7] spanning across six tehsils and 90 villages in Wardha, Yavatmal, Washim, Hingoli and Nanded district of Maharashtra,[8] requiring acquisition of 722 hectares land.[9]
Route
Alignment
The final alignment of the Wardha-Kalamb-Yavatmal-Digras-Pusad-Nanded route has the following stations:[1][2][3]
- Phase-I: Wardha-Kalamb-Yavatmal
- Phase-I.A Wardha to Kalamb, 62 km:
- Wardha Junction (existing city station)
- Sevagram Junction railway station (existing, optional interchange)
- Seloo (new)
- Hinganghat (existing, major halt)
- Kalamb (Umri) (new, key station for Yavatmal connectivity)
- Phase-I.A Wardha to Kalamb, 62 km:
- Phase-II: Yavatmal-Digras-Pusad
- Phase-II.A Yavatmal-Digras (50 km)
- Darwha Moti Bagh Junction (existing)
- Digras (new junction station)
- Phase-II.A Yavatmal-Digras (50 km)
- Phase-II.B Digras-Pusad, 85 km:
- Mahagaon (new)
- Pusad (new)
- Phase-II.B Digras-Pusad, 85 km:
- Phase-III: Pusad-Nanded (90 km)
- Umarkhed (new)
- Hadgaon (new)
- Waranga
- Ardhapur (new)
- Dabhad (new)
- Mudkhed Junction railway station (existing, interchange to Nanded)
- Maltekdi (existing)
- Hazur Sahib Nanded junction, (existing, terminus)
Related connectivity
- Shakuntala Railway, the narrow-gauge rail track between Yavatmal old railway station and Achalpur in Amravati district, is being converted to broad-gauge.
Current status
- Overall:
- 2025 May: 47% physical work is complete with 91% of the total revised total budget of INR 3,445 exhausted with target completion date still showing January 2026 for the whole Wardha-Nanded route.[10] RVNL achieved the breakthrough in 370 meter long T3 tunnel between Digras and Pusad in June 2025 only after 4 months of tunneling.[11]
- Phase-III Pusad-Nanded, under-construction (2029 target): revised target as of June 2025 if protests and land issues are resolved.[1][2][3]
See also
- Expressways in Maharashtra
- Nagpur–Goa Shaktipeeth Expressway, via Yavatmal-Pusad-Hingoli-Parbhani-Latur
- Jalna-Nanded Expressway, northwest to southeast via Parbhani
- Rail transport in India
- Akola–Ratlam line gauge conversion (target completion 31 March 2028), once complete will provide shortest route between North-Northwest India and South-Southeast India
- Bhopal-Ramganj Mandi line, under-construction with target completion by December 2027, will provide shorter route from Ludiana-Hisar-Jaipur-Kota to Bhopal
- Shakuntala Railway, gauge conversion of line which runs parallel to the west of Wardha-Nanded line
- Future of rail transport in India
- Indian Railway
References
- ^ a b c d e f g h i Wardha-Nanded Final Route Approval (2025) (Report). Ministry of Railways. March 2025.
- ^ a b c d e f g h i "Wardha-Nanded Rail Project: Station List Finalized". Maharashtra Rail Infrastructure Corporation. May 2025.
- ^ a b c d e f g h i "Wardha-Nanded Rail Line: Full Construction Begins". Times of India. 10 June 2025.
- ^ "Wardha–Nanded rail line project gets special status".
- ^ "Land acquisition for new rail line in Yavatmal fast-tracked". 10 April 2017.
- ^ project summary, Indian Railway, 12 Dec 2024.
- ^ Land acquisition for new rail line in Yavatmal fast-tracked
- ^ "Wardha–Nanded rail line project gets special status". Business Standard India. Press Trust of India. 22 July 2016.
- ^ "Work will start soon". The Times of India.
- ^ Monthly status report on Wardha=Pusad rail line, indianrailways.gov.in, May 2025.
- ^ RVNL Achieves Tunnel Breakthrough on Wardha-Nanded Rail Line in Just 4 Months, nbmcw.com, 11 Jun 2025.