Trailblazer was a technology demonstration satellite, which was to have been operated by the United States Air Force and the Missile Defense Agency. It was selected for launch under a "Jumpstart" contract, to demonstrate responsiveness, with the final payload being chosen less than a month ahead of the scheduled launch date, and was launched as the primary payload of the third Falcon 1, which failed just over two minutes after launch on 3 August 2008. Two previous Falcon 1 launches also failed to reach orbit, but the fourth succeeded although it only carried a dummy payload.
It was originally built for a canceled MDA project, and was based on a SpaceDev MMB-100 satellite bus. It was launched from Omelek Island, Kwajalein Atoll at 03:34 UTC. Several other payloads were to be launched aboard the same launch vehicle, including two CubeSats for NASA (PRESat and NanoSail-D), and a space burial (Celestis-07) payload for Celestis, which would have remained attached to the launch vehicle in low Earth orbit.
References
SpaceX missions and payloads |
|---|
| Launch vehicles | |
|---|
| Falcon 1 missions | |
|---|
| Falcon 9 missions | | Demonstrations | |
|---|
| ISS logistics | |
|---|
| Crewed | |
|---|
Commercial satellites | |
|---|
Scientific satellites | |
|---|
Military satellites |
- NROL-76
- X-37B OTV-5
- Zuma
- SES-16 / GovSat-1
- Paz
- GPS III-01
- ANASIS-II
- GPS III-03
- NROL-108
- GPS III-04
- GPS III-05
- COSMO-SkyMed CSG-2
- NROL-87
- NROL-85 (Intruder 13A/B)
- SARah 1
- EROS-C3
- GPS III-06
- Transport and Tracking Layer (Tranche 0, Flight 1)
- Transport and Tracking Layer (Tranche 0, Flight 2)
- 425 Project flight 1 (EO/IR)
- SARah 2/3
- USSF-124
- 425 Project flight 2 (SAR #1)
- Weather System Follow-on Microwave 1
- NROL-146
- NROL-186
- NROL-113
- NROL-167
- NROL-126
- GPS III-07
- NROL-149
- 425 Project flight 3 (SAR #2)
- NROL-153
- Spainsat NG I
- NROL-57
- NROL-69
- NROL-192
- NROL-145
- 425 Project flight 4 (SAR #3)
- GPS III-08
- SDA Tranche 1 DES
- Dror-1
- USSF-36 (X-37B OTV-8)
- National Advanced Optical System (NAOS)
- SDA Tranche 1 Transport layer T1TL-B
- NROL-48
- SDA Tranche 1 Transport layer T1TL-C
- Spainsat NG II
- 425 Project flight 5 (SAR #4)
- NROL-77
- CSG-3
- NROL-105
- GPS III-09
- GPS III-10
- SDA Tranche 1 Transport layer T1TL-D
- SDA Tranche 1 Transport layer T1TL-E
- SDA Tranche 1 Tracking layer T1TR-C
- USSF-31
- Skynet 6A
- SDA Tranche 1 Transport layer T1TL-F
- SDA Tranche 1 Tracking layer T1TR-A
- SDA Tranche 1 Tracking layer T1TR-E
- SDA Tranche 2 Transport layer T2TL-A
- SDA Tranche 2 Transport layer T2TL-C
- SDA Tranche 2 Transport layer T2TL-D
- SDA Tranche 2 Transport layer T2TL-E
- USSF-75
- USSF-70
- SDA Tranche 2 Transport layer T2TL-F
- SDA Tranche 2 Transport layer T2TL-G
- SDA Tranche 2 Transport layer T2TL-H
|
|---|
| Starlink | |
|---|
| Rideshares | |
|---|
|
|---|
| Falcon Heavy missions | |
|---|
| Starship missions | | Flight tests | |
|---|
| Crewed | |
|---|
Commercial satellites | |
|---|
|
|---|
- Ongoing spaceflights are underlined
- Future missions and vehicles under development in italics
- Failed missions† are marked with dagger †
|
|
|---|
| January | |
|---|
| February | |
|---|
| March | |
|---|
| April | |
|---|
| May | |
|---|
| June | |
|---|
| July | |
|---|
| August | |
|---|
| September | |
|---|
| October | |
|---|
| November | |
|---|
| December | |
|---|
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses). |