Selangor State Route B55

Selangor Route 55
Jalan Sungai Air Tawar
Major junctions
North endSungai Air Tawar
Major intersections FT 5 Federal Route 5
B53 Jalan Bagan Terap
B46 Jalan Parit Baru
B46 Jalan Sungai Tengar
A123 State Route A123
Southeast endKampung Tebok Pulai
Location
CountryMalaysia
Primary
destinations
Sungai Air Tawar, Bagan Nakhoda Omar
Highway system

Selangor State Route B55, Jalan Sungai Air Tawar is a major road in Selangor, Malaysia. It is also a main route to Bagan Nakhoda Omar. There are many parit (canals) and villages along this road.[1]

History

The 2.80 km (1.74 mi) new bridge crossing Bernam River connecting from Sungai Air Tawar, Selangor to Parit 17, Hutan Melintang, Perak, with an allocation of RM220 million built from 25 August 2022, expected completed on 7 December 2026.[2][3] Due to the several technical reasons, the expected date extend to September 2027.[4][5]

On 30 April 2026, the Sungai Air Tawar–Hutan Melintang Bridge project reached 1 million working hours without major incident (LTI).[6]

Features

  • Sungai Air Tawar–Hutan Melintang Bridge (under construction)
  • many parit (canals) and villages along this road[1]

Junction lists

Legend:

StateDistrictLocationkmmiNameDestinationsNotes
SelangorSabak BernamSabakKampung Tebok Pulai FT 5 Malaysia Federal Route 5 – Teluk Intan, Bagan Datuk, Sabak, Kuala Selangor, Tanjung Karang, Sekinchan
Jalan Angkasa
Diamond interchange
Zon IKS Sabak Bernam
Kampung Batu Tiga Puluh DaratB53 Jalan Bagan Terap – Sabak, SekendiJunctions
Kampung Banting
Kampung Tebuk Jawa
Bagan Nakhoda OmarTaman Seri Nakhoda
Bagan Nakhoda OmarBagan Nakhoda Omar Recreational Park
V
T-junctions
Bagan Nakhoda Omar
Kampung Simpang Empat Bagan Nakhoda Omar
B46 Jalan Parit Baru – Kampung Sungai ApongT-junctions
Sungai Air TawarSungai Air TawarB46 Jalan Sungai Tengar – Kampung Sungai Tengar, Kampung Parit BaharuT-junctions
Sungai Air Tawar
Town Centre
Jalan MasjidJunctions
Kampung Datuk Rahmat ShafieeJalan Kampung Dato HormatT-junctions
Selangor–Perak borderSungai Air Tawar–Hutan Melintang Bridge
Bernam River bridge
Under construction
PerakBagan DatukHutan MelintangHutan Melintang
Parit 17
A123 Perak State Route A123 – Hutan Melintang, Bagan Datuk, SelekohT-junctions
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

References

  1. ^ a b "即将动工 料2026年完工 半港17条沟建桥 衔接雪霹 - 地方". Sin Chew Daily (in Chinese (Malaysia)). 2023-02-22. Retrieved 2026-06-13.
  2. ^ Bernama (2021-10-18). "RM220 million bridge linking Selangor and Perak ready in May 2025 | New Straits Times". New Strait Times. Retrieved 2026-06-13.
  3. ^ TAHIR, MOHD IZZATUL IZUAN (2024-06-04). "Jambatan Sungai Air Tawar-Hutang Melintang dijangka siap Jun 2026". Sinar Harian (in Malay). Retrieved 2026-06-13.
  4. ^ "双溪侨华─半港桥 工程延误料2027年竣工". China Press (in Chinese (Malaysia)). 2025-11-13. Retrieved 2026-06-13.
  5. ^ "Project JB28". BBSB International Limited. Retrieved 2026-06-13.
  6. ^ Ishak, Mahani (2026-04-30). "Projek Jambatan Sungai Air Tawar -Hutan Melintang capai 1 juta jam bekerja selamat tanpa kecederaan". Berita Harian. Retrieved 2026-06-13.