Mahanagar Prabhati/Godhuli Express
| Overview | |
|---|---|
| Service type | Inter-city rail |
| Status | Operating |
| First service | 25 February 1986 |
| Current operator | Bangladesh Railway |
| Route | |
| Termini | Chattogram railway station Kamalapur railway station |
| Stops | 8 |
| Train number | 703/704 |
| On-board services | |
| Seating arrangements | Airline style |
| Sleeping arrangements | Yes |
| Catering facilities | On-board |
| Observation facilities | Large windows |
| Entertainment facilities | Yes |
| Baggage facilities | Overhead racks |
| Technical | |
| Track gauge | 1,000 mm (3 ft 3+3⁄8 in) |
| Electrification | N/A |
| Operating speed | 80 km |
| Average length | 18/36 |
| Rake maintenance | Pahartali |
| Rake sharing | Turna Express |
Mahanagar Prabhati/Godhuli Express (Train No. 703/704) is an intercity passenger train in Bangladesh operated by Bangladesh Railways, which runs between Chittagong Railway Station in Chittagong District and Kamalapur railway station in Dhaka District. The train runs from Chittagong to Dhaka under the name Mahanagar Godhuli and from Dhaka to Chittagong under the name Mahanagar Prabhati.[1][2] The train connects Feni, Comilla, Brahmanbaria districts along the route. Along with this train, the following trains run on the Chittagong-Dhaka route: Subarna Express, Mahanagar Express, Turna Express, Shonar Bangla Express, Chattala Express, Dhaka/Chittagong Mail and Karnaphuli Express. The base of the train is Chittagong Railway Station.[3][4][5]
History
The train was inaugurated on Friday, 25 February 1986. The train officially started running on Saturday, 26 February 1986. At that time, the train was running on the Dhaka - Dohazari route. From 1998, two trains, Mahanagar Prabhati/Godhuli and Turna, started running by sharing rakes. From 2002, the train started running on the Dhaka - Chittagong route.[6]
Stopover
(Sometimes, the stops of a train may be changed by Bangladesh Railway. The following list is valid till 2020.)
- Feni Junction
- Gunawati
- Laksam Junction
- Comilla
- Akhaura Junction
- Brahmanbaria
- Bhairab Bazar Junction
- Narsingdi railway station
- Dhaka Airport railway station
Rolling stock
The train uses a 3000 class locomotive. Previously, 2900 or 2600 class locomotives were used. The train initially ran on a rake of old green-yellow vacuum brake coaches. Later in 2011, this rake was changed to a white Chinese air brake coach rake. Later, the train's rake was changed again to red-green Indonesian air brake PT Inka 2016 model coach rake. Currently, the train runs on a 18/36 load. Out of these 18 coaches, there are 5 AC chairs, 3 AC sleepers, 1 non-AC sleepers, 6 fully shovon chairs, 2 shovon chairs guard brake + dining car and 1 power car. When passenger demand increases (such as during Eid), the train is run on a 21/42 load. Currently, it is being operated with state-of-the-art coaches imported from Korea.[7][8]
References
- ^ মহানগর প্রভাতী-তূর্ণা এক্সপ্রেসের কোচ পাচ্ছে উপবন-জয়ন্তিকা. banglanews24.com (in Bengali). 16 November 2016. Retrieved 13 May 2025.
- ^ ফেরার পথে মহানগর প্রভাতী প্রাণ নিল আরও একজনের. 29 July 2022. Retrieved 13 May 2025.
- ^ Ghosh, Sujan (20 March 2024). স্টেশনে স্টেশনে দাঁড়াচ্ছে ঢাকা-চট্টগ্রাম রুটের ট্রেন, যাত্রীরা বিড়ম্বনায়. Prothom Alo (in Bengali). Retrieved 13 May 2025.
- ^ নতুন সূচিতে চলছে ১০ ট্রেন. banglanews24.com (in Bengali). 10 March 2025. Retrieved 13 May 2025.
- ^ ৪ দিন পর চট্টগ্রামের সঙ্গে শুরু হচ্ছে সারা দেশের ট্রেন চলাচল. Bangla Tribune (in Bengali). Retrieved 13 May 2025.
- ^ ট্রেনের ধাক্কায় মাইক্রোবাসের ১১ জনের মৃত্যু: রেলের ২ তদন্ত কমিটি. bdnews24.com (in Bengali). Retrieved 13 May 2025.
- ^ পড়াতে যাওয়ার পথে ট্রেনে কাটা পড়ে মৃত্যু. Prothom Alo (in Bengali). 21 January 2025. Retrieved 13 May 2025.
- ^ ঢাকা থেকে ট্রেন চলাচল শুরু হলেও সবগুলোই ছাড়ছে দেরিতে. Dhaka Post (in Bengali). 25 October 2024. Retrieved 13 May 2025.