Mentarang Induk Hydroelectric Power Plant

Mentarang Induk Hydroelectric Power Plant
Mentarang Induk Hydroelectric Power Plant
Location in Kalimantan, Indonesia
Mentarang Induk Hydroelectric Power Plant
Mentarang Induk Hydroelectric Power Plant (Indonesia)
Official namePembangkit Listrik Tenaga Air Mentarang Induk
CountryIndonesia
LocationMalinau Regency, North Kalimantan
Coordinates3°36′N 116°12′E / 3.6°N 116.2°E / 3.6; 116.2
PurposePower generation
StatusUnder construction
Construction began2023
Opening date2029 (expected)
Construction costUS$2.6–3.2 billion (estimated)
OwnerPT Kayan Hydropower Nusantara
Dam and spillways
ImpoundsMentarang River
Power Station
TurbinesHydropower, reservoir-regulated run-of-river
Installed capacity1,375 MW

Mentarang Induk Hydroelectric Power Plant (Indonesian: Pembangkit Listrik Tenaga Air Mentarang Induk), commonly abbreviated as MIHEP, is a 1,375 MW hydroelectric power project under development on the Mentarang River in Malinau Regency, North Kalimantan, Indonesia. The project is being developed by PT Kayan Hydropower Nusantara (KHN), a joint venture owned by AlamTri Resources (50%), Sarawak Energy (25%), and PT Kayan Patria Pratama (25).[1]

MIHEP is intended to provide renewable baseload electricity primarily to the KIPI Tanah Kuning, one of Indonesia's largest industrial development zones focusing on green metals, nickel processing, and aluminium smelting.

Background

North Kalimantan has been identified as one of Indonesia's richest hydropower regions, with potential exceeding 9 GW across the Kayan and Mentarang river basins.[2] Development of MIHEP accelerated after the Indonesian government prioritized KIPI as a strategic national project requiring long-term renewable power supply.

Project Description

The project has an installed capacity of 1,375 MW and will use a combination of dam and reservoir-regulated run-of-river hydropower. Major project components include:

  • Main dam and diversion tunnel
  • Powerhouse complex
  • High-voltage 275–500 kV transmission line to KIPI
  • Access roads and auxiliary civil works

Estimated annual electricity generation is 8–9 TWh, depending on hydrological conditions.[2]

Developers and Ownership

As of 2025, ownership of PT Kayan Hydropower Nusantara is as follows:

  • 50% – PT Alamtri Resources Indonesia Tbk (ADRO)
  • 25% – Sarawak Energy Berhad
  • 25% – PT Kayan Patria Pratama

Early development previously involved Sarang Energy Group, though ownership shifted as new investors joined.[3]

Construction

A ceremonial groundbreaking was held on 1 March 2023.[3] Initial works, including access road preparation, began in 2023–2024.[4]

The developer is targeting financial close in 2026, after which full EPC construction is expected to accelerate.[5] Commercial operation is expected around 2029–2030, subject to financing and regulatory processes.

Purpose and Industrial Integration

The project is one of the primary renewable energy sources planned for the KIPI Tanah Kuning industrial zone, which will host:

  • Nickel matte, HPAL, and ferronickel facilities
  • Aluminium smelters
  • EV battery component manufacturing
  • Potential green hydrogen and ammonia production

Supplying these industries with renewable hydropower supports Indonesia's ambition to produce “green metals” for export markets.

Environmental and Social Impact

MIHEP is subject to Indonesia's AMDAL environmental assessment requirements. Mitigation measures include watershed management, biodiversity surveys, sediment control, and engagement with nearby communities in Malinau Regency.

See also

References

  1. ^ "Adaro (ADRO) Kuasai 50% Saham Kayan Hydropower". IndoPremier. Retrieved 2024-11-15.
  2. ^ a b "Mentarang hydroelectric plant". Global Energy Monitor. Retrieved 2024-11-15.
  3. ^ a b "Sarawak moves closer to regional powerhouse aspiration through hydropower venture in Indonesia". Sarawak Energy. 2023-03-01. Retrieved 2024-11-15.
  4. ^ "Kayan Hydropower akan kebut proyek PLTA Mentarang". Dunia Energi. 2025-03-08. Retrieved 2025-01-12.
  5. ^ "Kayan Hydropower targets Q1 2026 financial close for major hydropower project". Petromindo. Retrieved 2025-01-12.