Lower Sre Pok 2 Dam

Lower Sre Pok 2 Hydropower Dam
CountryCambodia
LocationTonle Sre Pok
StatusProposed
Opening date2018[1]
Construction costUS$338.9 million[2]
OwnerEVN
Dam and spillways
Type of damRun-of-river[3]
ImpoundsSre Pok River
Height25 m (82 ft)[3]
Reservoir
Total capacity0.42 km3 (340,000 acre⋅ft)[3]
Catchment area30,620 km2 (11,820 sq mi)[2]
Surface area120 km2 (46 sq mi)[2][3]
Power Station
Installed capacity400 MW (540,000 hp)[3] (max. )
Annual generation1,174 GWh (4,230 TJ)[3]

The Lower Se San/Sre Pok 2 scheme hydroelectric dam is located in Stung Treng Province, Cambodia on the Tonle Sre Pok some 2 kilometres (1.2 mi) upstream of its confluence with the Se San, and about 37 kilometres (23 mi) upstream of the confluence of the combined Sre Pok, Se San and Se Kong rivers with the Mekong mainstream. The dam was officially opened on December 18, 2018.[4]

See also:

References

  1. ^ Cambodia National Mekong Committee National Sector Review 2003: Hydropower
  2. ^ a b c Se Kong-Se San and Nam Theun river basins hydropower study final report (PDF) (Report). Vol. 5. Halcrow Group. July 1999. Retrieved 2012-07-19.
  3. ^ a b c d e f Environmental Impact Assessment on the Cambodian part of the Srepok River due to hydropower development in Vietnam (PDF) (Report). SWECO Grøner. November 2006. p. 38. Archived from the original (PDF) on 2013-05-15. Retrieved 2012-07-19.
  4. ^ "Lower Se San 2 Dam", Wikipedia, 2024-05-28, retrieved 2024-12-03