Gold Line (Mumbai Metro)
| Gold Line | |
|---|---|
| Overview | |
| Status | Approved by the State Government |
| Owner | MMRDA, CIDCO |
| Locale | Mumbai, Maharashtra, India |
| Termini | |
| Service | |
| Type | Airport Express Train |
| System | Mumbai Metro |
| Operator(s) | MMRDA, CIDCO |
| Technical | |
| Line length | 35 km (22 mi) |
| Character | Elevated, Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Line 8 or the Gold Line is an approved line of the Mumbai Metro. It would run from Chhatrapati Shivaji Maharaj International Airport to Navi Mumbai International Airport.[1][2] The 35-kilometre (22 mi) line would be both elevated and underground and cost ₹150,000,000,000.[2]
It has been approved by the Government of Maharashtra, the Detailed Project Report may be made by CIDCO. It is to be developed in a Public-Private Partnership (PPP) model, similar to Mumbai Metro Blue Line 1.[3]
Stations
| Gold Line (Line 8) | |||||||
| # | Station | Interchange | Opened | Alignment | |||
|---|---|---|---|---|---|---|---|
| English | Marathi | ||||||
| 1 | Chhatrapati Shivaji Maharaj International Airport - T2 | छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी२ | Red Line (under construction) | Proposed | Underground | ||
| 2 | Phoenix Mall | फिनिक्स मॉल | Proposed | Underground | |||
| 3 | SG Barve Marg | एस.जी. बर्वे मार्ग | Yellow Line (under construction) | Proposed | Underground | ||
| 4 | Kurla | कुर्ला | Proposed | Underground | |||
| 5 | Lokmanya Tilak Terminus | लोकमान्य टिळक टर्मिनस | Proposed | Underground | |||
| 6 | Garodia Nagar | गरोडिया नगर | Green Line (under construction) | Proposed | Underground | ||
| 7 | Baiganwadi | बैगनवाडी | Proposed | Elevated | |||
| 8 | Mankhurd | मानखुर्द | Yellow Line (under construction) | Proposed | Elevated | ||
| 9 | ISBT | आयएसबीटी | Proposed | Elevated | |||
| 10 | Vashi | वाशी | Proposed | Elevated | |||
| 11 | Sanpada | सानपाडा | Proposed | Elevated | |||
| 12 | Juinagar | जुईनगर | Proposed | Elevated | |||
| 13 | LP | एल.पी. | Proposed | Elevated | |||
| 14 | Nerul | नेरुळ | Proposed | Elevated | |||
| 15 | Seawoods | सीवूड्स | Proposed | Elevated | |||
| 16 | Apollo | अपोलो | Proposed | Elevated | |||
| 17 | Sagar Sangam | सागर संगम | Proposed | Elevated | |||
| 18 | Targhar | तरघर | Proposed | Elevated | |||
| 19 | Navi Mumbai International Airport West | नवी मुंबई आंतरराष्ट्रीय विमानतळ पश्चिम | Proposed | Elevated | |||
| 20 | Navi Mumbai International Airport Terminal 2 | नवी मुंबई आंतरराष्ट्रीय विमानतळ टर्मिनल २ | Proposed | Elevated | |||
References
- ^ "Mumbai's airport Metro will have a train every 15 minutes". Hindustan Times. 30 March 2018. Archived from the original on 24 June 2024. Retrieved 27 December 2024.
- ^ a b "Gold Line Metro: Maharashtra govt to finalise executing agency for Rs 15,000 crore corridor linking Mumbai, Navi Mumbai airports". The Times of India. 13 December 2024. ISSN 0971-8257. Retrieved 27 December 2024.
- ^ "Metro Line 8 approved: Seamless Chhatrapati Shivaji Maharaj International Airport (CSMIA) to Navi Mumbai International Airport (NMIA) connectivity; all you need to know". The Times of India. 28 January 2025. ISSN 0971-8257. Retrieved 2 March 2025.