Line 7 (Tianjin Metro)

Line 7
Line 7 train leaving Gulou station
Overview
StatusOperational
OwnerCREC (Tianjin) Rail Transport Investment & Construction Co., Ltd.
LocaleTianjin, China
Termini
Stations15
Service
TypeRapid transit
SystemTianjin Metro
Operator(s)CREC (Tianjin) Rail Transport Investment & Construction Co., Ltd.
Rolling stock6-car type A
History
Opened28 September 2025 (2025-09-28)
Technical
Line length21.82 km (13.56 mi)[1]
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1,500 V DC Overhead catenary
Operating speed80 km/h (50 mph) (Maximum design speed)

Line 7 of Tianjin Metro is a metro line in Tianjin, China. This is the first line of Tianjin Metro system operating under PPP contract[2].

Line 7 has a total length of 42.53 kilometers, from Beichen District High-speed Railway North Xincheng Station to Xiqing District Saida Bazhi Road Station. The first phase of the project has a total length of 26.53km, 21 stations, and an estimated investment of 26.897 billion RMB, of which 19.681 billion RMB is included in the scope of PPP projects, of which the project cost is about 14.651 billion RMB[2].

On 28 September 2025 at 6:17 am, the southern section of Line 7 from Saidalu to Gulou with 15 stations officially put into operation[1] [3].

Opening Timeline

Segment Commencement Length Station(s) Name

Saidalu — Gulou

30 June 2025 21.82 km (13.56 mi)[1] 15 South section[1]

List of stations

Station name Transfer Distance

km

Location
English Chinese
Saidalu 赛达路 Xiqing
Lubeilu 芦北路
Hongyuandao 宏源道
Xinghuadao 兴华道
Zhangdaokou 张道口
Meijianghuizhanzhongxinnan 梅江会展中心南
Wanglanzhuang 王兰庄
Lijiangdao 丽江道
Zhongliuyiyuan 肿瘤医院 Hexi
Tianta 天塔 Nankai
Nankaidaxuebalitai 南开大学八里台
Tianjindaxueliulitai 天津大学六里台 Heping
Haiguangsi 海光寺 Nankai
Fuandajie 福安大街 Heping
Gulou 鼓楼 Nankai

References

  1. ^ a b c d "官宣!天津地铁7号线9月28日开通,南北动脉贯通!". 25 September 2025.
  2. ^ a b "神州高铁:关于天津地铁7号线一期工程PPP项目的进展公告". 4 November 2019.
  3. ^ "直击|地铁7号线正式开通!纵贯南北!串联一座城!". 28 September 2025.