Line 7 (Tianjin Metro)
| Line 7 | |
|---|---|
Line 7 train leaving Gulou station | |
| Overview | |
| Status | Operational |
| Owner | CREC (Tianjin) Rail Transport Investment & Construction Co., Ltd. |
| Locale | Tianjin, China |
| Termini |
|
| Stations | 15 |
| Service | |
| Type | Rapid transit |
| System | Tianjin Metro |
| Operator(s) | CREC (Tianjin) Rail Transport Investment & Construction Co., Ltd. |
| Rolling stock | 6-car type A |
| History | |
| Opened | 28 September 2025 |
| Technical | |
| Line length | 21.82 km (13.56 mi)[1] |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1,500 V DC Overhead catenary |
| Operating speed | 80 km/h (50 mph) (Maximum design speed) |
Line 7 of Tianjin Metro is a metro line in Tianjin, China. This is the first line of Tianjin Metro system operating under PPP contract[2].
Line 7 has a total length of 42.53 kilometers, from Beichen District High-speed Railway North Xincheng Station to Xiqing District Saida Bazhi Road Station. The first phase of the project has a total length of 26.53km, 21 stations, and an estimated investment of 26.897 billion RMB, of which 19.681 billion RMB is included in the scope of PPP projects, of which the project cost is about 14.651 billion RMB[2].
On 28 September 2025 at 6:17 am, the southern section of Line 7 from Saidalu to Gulou with 15 stations officially put into operation[1] [3].
Opening Timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
|
Saidalu — Gulou |
30 June 2025 | 21.82 km (13.56 mi)[1] | 15 | South section[1] |
List of stations
| Station name | Transfer | Distance
km |
Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Saidalu | 赛达路 | Xiqing | |||||
| Lubeilu | 芦北路 | ||||||
| Hongyuandao | 宏源道 | ||||||
| Xinghuadao | 兴华道 | ||||||
| Zhangdaokou | 张道口 | ||||||
| Meijianghuizhanzhongxinnan | 梅江会展中心南 | ||||||
| Wanglanzhuang | 王兰庄 | ||||||
| Lijiangdao | 丽江道 | ||||||
| Zhongliuyiyuan | 肿瘤医院 | Hexi | |||||
| Tianta | 天塔 | Nankai | |||||
| Nankaidaxuebalitai | 南开大学八里台 | ||||||
| Tianjindaxueliulitai | 天津大学六里台 | Heping | |||||
| Haiguangsi | 海光寺 | Nankai | |||||
| Fuandajie | 福安大街 | Heping | |||||
| Gulou | 鼓楼 | Nankai | |||||
References
- ^ a b c d "官宣!天津地铁7号线9月28日开通,南北动脉贯通!". 25 September 2025.
- ^ a b "神州高铁:关于天津地铁7号线一期工程PPP项目的进展公告". 4 November 2019.
- ^ "直击|地铁7号线正式开通!纵贯南北!串联一座城!". 28 September 2025.