Line 4 (Nanning Metro)
| Line 4 | |
|---|---|
| 4 | |
Jinyang Lu station | |
| Overview | |
| Status | Operational |
| Owner | Nanning |
| Locale | Nanning, Guangxi, China |
| Termini |
|
| Stations | 19 (18 in operation) |
| Service | |
| Type | Rapid transit |
| System | Nanning Metro |
| Services | 1 |
| Operator(s) | Nanning Rail Transit Corporation |
| Depot(s) | Wuxiang Depot[1] |
| Rolling stock | 6-car Type B |
| History | |
| Opened | November 23, 2020 |
| Technical | |
| Line length | 24.6 km (15.29 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 4 of the Nanning Metro is a rapid transit line in Nanning. Consutruction started on June 30, 2016[1], and the line opened on 23 November 2020. The line is 24.6 km long with 18 stations.[2][3]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name | |
|---|---|---|---|---|---|
| Hongyun Lu — Lengtangcun | 23 November 2020 | 20.7 km (12.86 mi) | 16 | ||
| Lengtangcun — Longgang | 26 September 2025[4] | 3.9 km (2.42 mi) | 2 | Phase 1[4] |
Operating hours
Operating hours: 6:30-23:00 from Sunday to Thursday, will be extended to 24:00 on Fridays and Saturdays. At normal time, the train interval is 8 minutes. At peak hours on weekdays (7:30-9:00, 17:30-19:30), the train interval are 5 minutes. On weekends, the peak is flat all day, and the driving interval is 7 minutes.[5][6]
Stations
| Station name | Transfer | Distance km |
Location | |||
|---|---|---|---|---|---|---|
| English | Chinese | Zhuang | ||||
| Hongyun Lu | 洪运路 | Roen Hungzyin | Jiangnan | |||
| Nalicun | 那历村 | Nazlizcunh | ||||
| Nahong Overpass | 那洪立交 | Nazhungz Lizgyauh | 5 | |||
| Jinyang Lu | 金阳路 | Roen Ginhyangz | ||||
| Tongyuan Lu | 通源路 | Roen Dunghyenz | ||||
| Dashatian | 大沙田 | Dasahdenz | 2 | Liangqing | ||
| Jinxiang Dadao | 金象大道 | Daihloh Ginhsieng | ||||
| Wuxiangling | 五象岭 | Vujsienglingj | ||||
| Yuxiang Lu | 玉象路 | Roen Yisieng | ||||
| Advanced Business Park | 总部基地 | Cungjbu Gihdi | 3 | |||
| Feilong Lu | 飞龙路 | Roen Feihlungz | ||||
| Guangxi Sports Center West | 体育中心西 | Baihsae Dijyuz Cunghsinh | ||||
| Guangxi Sports Center East | 体育中心东 | Baihdoeng Dijyuz Cunghsinh | ||||
| Liangqing Bridge South | 良庆大桥南 | Baihnamz Liengzging Daihgiuz | ||||
| Liangqingxu | 良庆圩 | Liengzginghih | ||||
| Lengtangcun | 楞塘村 | Lwngzdangzcunh | ||||
| Wuxiang Railway Station | 五象火车 | Camh Vusieng Hojcehcan | ||||
| Qingpingpo | 良庆圩 | Camh Cinghbongzboh | ||||
| Longgang | 龙岗 | Camh Lungzgangh | ||||
References
- ^ a b "南宁地铁4号线 (Nanning Rail Transit Metro Line 4)".
- ^ "Nanning Metro Line 4 completed hot running and entered train on-line commissioning stage". www.crrcgc.cc. 2020-06-09. Retrieved 2021-07-16.
- ^ "Two openings expand Nanning metro". International Railway Journal. 2020-11-26. Retrieved 2021-07-16.
- ^ a b "南宁邕宁区通地铁了!4号线一期工程后通段开通初期运营". 26 September 2025.
- ^ "南宁地铁4号线最新线路图及站点". 23 November 2023.
- ^ "南宁市轨道交通4号线一期工程后通段开通初期运营". 26 September 2025.