Line 1 (Changzhou Metro)

Line 1
 1 
Line 1 train
Overview
StatusIn operation
LocaleChangzhou
Termini
Stations29[1]
Service
TypeRapid transit
SystemChangzhou Metro
History
Opened21 September 2019 (2019-09-21)[2]
Technical
Line length34.24 km (21.28 mi)[3]
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Line 1 of Changzhou Metro (Chinese: 常州地铁1号线; pinyin: Chángzhōu Dìtiě Yī Hào Xiàn) is a rapid transit line in Changzhou. It connects the two railway stations Changzhou and Changzhou North.

Construction for Line 1 began on 28 October 2014. The first phase runs from Forest Park (森林公园) in the north to Nanxiashu (南夏墅) in the south. Line 1 opened on 21 September 2019.[2]

Route description

The first phase of Line 1 tarts south of Xinlong Ecological Forest in Xinbei District, runs south along Leshan Road, then turns east at Changzhou North Railway Station. It then runs east along Liaohe Road to Middle Tongjiang Road, turning to the south thereafter, passing under the Beijing-Shanghai High-Speed Railway and the Shanghai-Chengdu Expressway. It then turns south from East Huanghe Road to North Jinling Road, passing through important areas such as Hehai, Changzhou Olympic Sports Center, and Changzhou Cultural Center, before passing through East Feilong Road and Xintang Road to a station below the north square of Changzhou Railway Station. After passing under the Shanghai-Nanjing Intercity and the Beijing-Shanghai Railway, it runs south along Heping Road, where it reaches Cultural Palace Station, the interchange station with Line 2. Continuing south, it passes under the Changzhou bypass of the Beijing-Hangzhou Grand Canal, then continues south along Huayuan Street, passing under the Changzhou Science and Education Town, thereafter continuing along Fengqi Road, crossing Wujin Railway Station on the Shanghai-Nanjing Riverside High-Speed Railway. After passing under the railway and the Shanghai-Wujin Expressway, the line emerges above ground and continues south on an elevated viaduct, ending at the intersection of Fengqi Road and Longfan Road.

Operation

Line 1 is designed for a speed of 80 km/h. The trains consist of B-type carriages with 6 cars per train. The trains are powered by DC 1500V overhead catenary. The line control center is located near Chashan station.

Opening timeline

Segment Commencement Length Station(s) Name
Forest Park — Nanxiashu 21 September 2019[2] 34.24 km (21.28 mi)[3] 29 Phase 1

Stations

Station name Connections Distance
km
Location
English Chinese
Forest Park 森林公园 Xinbei
Xinlong 新龙
Tourism and Commerce Institute 旅游学校
Xinqiao 新桥
Changzhou North Railway Station 常州北站 ESH
Changzhou BRT
Beijiao High School 北郊中学 Changzhou BRT
Foreign Language School 外国语学校 Changzhou BRT
Global Harbor 环球港 Changzhou BRT
Xinqu Park 新区公园
Hehai 河海
Olympic Sports Center 奥体中心
Citizens' Square 市民广场 Tianning / Xinbei
Cuizhu 翠竹 Tianning
Changzhou Railway Station 常州火车站 CZH
Boai Lu 博爱路
Cultural Palace 文化宫  2 
Changzhou BRT
Tongjiqiao 同济桥
Qingliang Temple 清凉寺
Chashan 茶山
Juhu Lu 聚湖路 Wujin
Hutang 湖塘
Xintiandi Park 新天地公园
Changhong Lu 长虹路
Yanzheng Dadao 延政大道
Kejiaocheng Bei 科教城北
Kejiaocheng Nan 科教城南 Changzhou BRT
Wujin Yanjiang Railway Station 武进沿江城际
Yanghu Lu 阳湖路
Nanxiashu 南夏墅

References

  1. ^ "揭开神秘面纱 常州地铁1号线向媒体开放". Archived from the original on October 23, 2019.
  2. ^ a b c "常州地铁1号线今日正式开通初期运营". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  3. ^ a b "定了!常州市轨道交通1号线本周六上午9:30开通". 2019-09-18. Archived from the original on 2019-09-21. Retrieved 2019-09-18.