New Khartoum International Airport

New Khartoum International Airport
مطار الخرطوم الدولي الجديد
Maṭār Al-Khurṭūm Al-Duwaliyy Al-Gadīd
Summary
Airport typePublic
Hub forSudan Airways
BuiltUnder construction since 2006 (2006)
Coordinates15°15′56″N 032°21′35″E / 15.26556°N 32.35972°E / 15.26556; 32.35972
Interactive map of New Khartoum International Airport

New Khartoum International Airport (Arabic:مطار الخرطوم الدولي الجديد) is an international airport under construction since 2006[1] in Omdourman, Sudan, 40 km (25 mi) south of Khartoum's city centre. It completed its first milestone (an annual capacity of 6 million) in 31 December 2025.[2]

History

Completion was scheduled for 2010[1] which was moved to 2022.[3] This was planned to have two 4,000 metres (13,000 ft) runways, a passenger terminal of 86,000 square metres (930,000 sq ft) and a 300-room international hotel.[4][1] Construction was to be carried out by China Harbour Engineering Co. (CHEC),[5] but the Turkey-based construction firm Summa was later selected for construction of New Khartoum Airport in 2018,[6] but construction has been suspended as of 2021.[3]

References

  1. ^ a b c "Sudan to build new international airport near Khartoum". English.peopledaily.com.cn. Archived from the original on 5 May 2008. Retrieved 13 June 2008.
  2. ^ "New Khartoum Airport New Airport Profile | CAPA". centreforaviation.com. Retrieved 2026-01-03.
  3. ^ a b "Why growing is a pain at Khartoum". africanaerospace.aero. March 31, 2021.
  4. ^ "Construction of the new Khartoum Airport begins in October". Sudan Tribune. 20 February 2006. Archived from the original on 1 August 2006. Retrieved 13 June 2008.
  5. ^ "The African Aviation Tribune". The African Aviation Tribune. 17 July 2013. Retrieved 29 April 2014.{{cite web}}: CS1 maint: deprecated archival service (link)
  6. ^ "New Khartoum Airport New Airport Profile | CAPA". centreforaviation.com. Retrieved 2024-06-07.

Bibliography