Kareeya Hydro Power Station

Kareeya Hydro Power Station
Kareeya Hydro Power Station
Location of the power station in Queensland
Interactive map of Kareeya Hydro Power Station
CountryAustralia
LocationFar North Queensland
Reservoir
CreatesKoombooloomba Dam
Power Station
Coordinates17°46′02″S 145°34′41″E / 17.7671°S 145.5780°E / -17.7671; 145.5780
OperatorCleanCo Queensland
Commission date1957
TypeRun-of-the-river
Turbines4
Installed capacity88 MW (118,000 hp)
Annual generation22.5 GWh (81 TJ)
Website
www.stanwell.com/energy-assets/our-power-stations/hydro/

The Kareeya Hydro Power Station is an underground run-of-the-river hydroelectric power station, located in Cardstone near Tully in Far North Queensland, Australia. The power station began generating electricity in 1957 and has capacity of 88 megawatts (118,000 hp), that is fed into the National Electricity Market.[1] The power station is owned by CleanCo Queensland.[2]

Overview

Taking its name from the Aboriginal word meaning 'big water', the Kareeya Hydro project originally comprised construction of Koombooloomba Dam, the Tully Falls Weir, and the power station.[1] A dam was needed for water storage because most of the rain in the area falls in the first few months of the year.[3] An intake tower is located in the weir, which directs water down a tunnel to the turbines in an underground power station below Tully Falls.

Planning for the project began in 1949 and it was intended to be operating by 1955.[3] Construction of a diversion tunnel started in early 1952. The 132 Kv transmission line was the first constructed in Queensland and the state's first use of steel towers for electricity distribution.[3] The last of the four generating sets was installed by mid-1959.

The power station's staff and families were provided accommodation in a small village, named Cardstone, located downstream from the plant.[3]

In 1988, the Queensland Government approved plans to automate the power station. The benefits were the reduced need for on-site staff, which in turn minimised the problems with staff accessing the power station during the wet season when roads became impassable.[4]

The power station was upgraded between 2005 and 2008 that extended its life by 25 years and increased its capacity, generation, efficiency, and availability.[1]

See also

References

  1. ^ a b c "Kareeya Hydro" (PDF). Our power stations: Hydro. Stanwell Corporation. March 2015. Archived from the original (PDF) on 3 March 2016. Retrieved 2 November 2015.
  2. ^ "OUR SITES". CleanCo Queensland. Retrieved 28 March 2020.
  3. ^ a b c d Dunn, Col (1985). The History of Electricity in Queensland. Bundaberg: Col Dunn. pp. 98–103. ISBN 0-9589229-0-X.
  4. ^ "Item ID2999878, Automation of Kareeya and Barron Gorge Hydro Power Stations, 5 April 1988". Queensland State Archives. Retrieved 24 September 2025.