Hi-Tech North station

Hi-Tech North

高新北
Platform
Chinese name
Chinese高新北
Transcriptions
Standard Mandarin
Hanyu PinyinGāoxīn Běi
Yue: Cantonese
Yale RomanizationGōusān Bāk
JyutpingGou1 San1 Bak1
General information
LocationIntersection of Keyuan Road (科苑路) and Langshan Road (朗山路)
Yuehai Subdistrict, Nanshan District, Shenzhen, Guangdong
China
Operated byMTR China Railway Electrification Rail Transit (Shenzhen) Co., Ltd
(MTR Rail Transit (Shenzhen) Co., Ltd. and China Railway Electrification Bureau Group Co., Ltd.)
Line     Line 13
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 December 2025 (2025-12-28)
Previous namesSongping (松坪)
Services
Preceding station Shenzhen Metro Following station
Hi-Tech Central Line 13 Shigu
towards Shangwu
Location

Hi-Tech North station (Chinese: 高新北; pinyin: Gāoxīnběi Zhàn; Cantonese Yale: Gōusān Bāk Jaahm), is a station on Line 13 of Shenzhen Metro. It opened on 28 December 2025, and is located in Nanshan District.[1]

Station layout

G - Exits A1, A2, C, D, E
B1F
Concourse
Lobby Ticket Machines, Customer Service, Station Control Room
B2F
Platforms
Platform 1 13 towards Shenzhen Bay Checkpoint (Hi-Tech Central)
Island platform, doors will open on the left
Platform 2 13 towards Shangwu (Shigu)

Entrances/exits

The station has 5 points of entry/exit, with Exits A2 and C being accessible via elevator.

  • A1, A2: Keyuan Road (E), Langshan Road, Dongjiang Environmental Company Limited Building
  • C: Keyuan Road (E), Langshan Road, Fuwai Shenzhen Hospital, Songping Hill Park, Songping No. 2 Primary School
  • D: Keyuan Road (W), Langshan Road, China Resources Beverage (Holdings) Company Limited Main Factory, Shenzhen Neptunus Bioengineering Company Limited, Coolpad
  • E: Keyuan Road (W), Langshan Road, Health Yuan Group Headquarters Garden, Shenzhen Flour Company Limited, Hytera Building, Shenzhen Hepalink Pharmaceutical Group Company Limited

Construction timeline

  • On 26 July 2017, Shenzhen Metro Group Co., Ltd. issued the "Environmental Impact Report of Shenzhen Urban Rail Transit Line 13 Project", which includes this station, and the project is named Songping Station.[2]
  • On 22 April 2022, the Shenzhen Municipal Bureau of Planning and Natural Resources issued the Announcement on the Approval of the Plan for the Station Names of Relevant Lines of the Fourth Phase of Shenzhen Metro, and the station was renamed from "Kexing Station" to the official station name, "Hi-Tech North Station".[3]
  • On 25 July 2022, the station structure was successfully enclosed.[1]
  • On 28 December 2025, the station officially opened along with the new stations of Line 13's Phase 1 North Section (except Xili HSR station).

References

  1. ^ a b "中建交通华南公司深圳地铁13号线二工区松坪站围护结构顺利围闭" [The enclosure structure of Songping Station, Second Work Area, Shenzhen Metro Line 13, China Construction Transportation South China Company was successfully enclosed]. Economic Information Daily (in Simplified Chinese). 25 July 2022. Archived from the original on 14 April 2023. Retrieved 26 January 2025.
  2. ^ 深圳大事 (26 July 2017). "深圳地铁13号线开始第一次环评公示!车站数不少于14座,全走地下…" [Shenzhen Metro Line 13 begins first environmental impact assessment announcement! There will be no less than 14 stations, all underground…] (in Simplified Chinese). Archived from the original on 15 January 2023. Retrieved 26 January 2025.
  3. ^ 深圳市规划和自然资源局. "关于《深圳市轨道四期相关线路站名规划》批准方案的公告" [Announcement on the Approval of the "Shenzhen Metro Phase IV Related Line Station Name Planning"]. Shenzhen Government Online (in Simplified Chinese). Archived from the original on 28 October 2022. Retrieved 26 January 2025.