Florida State Road 516

State Road 516
Lake–Orange Expressway
Route information
Maintained by CFX
Length4.4 mi (7.1 km)
Major junctions
West end US 27
Major intersections CR 455
East end SR 429
Location
CountryUnited States
StateFlorida
CountiesLake, Orange
Highway system
SR 514 SR 517

State Road 516 (SR 516) is a toll road under construction by the Central Florida Expressway Authority (CFX). Once completed, it will serve an important transportation link between US Highway 27 (US 27) in Lake County and SR 429 in Orange County. It will also contain a full interchange with the planned County Road 455 (CR 455) extension providing access to nearby Schofield Road, and a partial interchange with Valencia Parkway featuring an eastbound exit and westbound entrance ramps. The expressway would contain two 12-foot (3.7 m) travel lanes in each direction, and two 12-foot (3.7 m) shoulders on each side of the roadway in each direction. It also is planned to feature a recreational trail along the south side of the expressway that would extend from US 27 and ending its alignment with SR 516 at the CR 455 interchange. It also is going to be part of a pilot project with ASPIRE in pavement charging of electric vehicles. As part of construction, US 27 would slightly be shifted eastward in the area to avoid disruption to the Lake Louisa State Park on the western side of the roadway.

The first projects went to bid in late 2022.[1] Construction began in May 2024 with completion estimated for 2029. It would serve as a capacity reliever to both SR 50 to the north and US 192 to the south.

Groundbreaking for segment 3 began on April 4, 2024, with a completion year of 2027. This segment runs from SR 429 to the Orange–Lake county line. Construction for segments 1 and 2 will break ground in 2026 with a completion year of 2029.[2]

Exit list

CountyLocationmikmExitDestinationsNotes
LakeClermont0.00.00 US 27 (SR 25) – Clermont, Haines CityWestern terminus
Four Corners2.84.52 CR 455 (County Road 455 Extension)Located in Segment 2
OrangeHorizon West3AValencia ParkwayPartial dumbbell interchange under construction; Westbound entrance and eastbound exit only; located in Segment 3
4.47.13B SR 429Eastern terminus; SR 429 exit 12
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ Lynch, Ryan (March 28, 2022). "See Central Florida Expressway Authority's largest construction projects going to bid". Orlando Business Journal. Retrieved May 23, 2023.
  2. ^ "State Road 516 (Lake/Orange Expressway) from US 27 to SR 429 | Central Florida Expressway Authority". May 7, 2020. Retrieved January 2, 2026.