Firozabad railway station

Firozabad railway station
Firozabad railway station
General information
LocationNH 2, Firozabad, Uttar Pradesh
India
Coordinates27°08′51″N 78°23′13″E / 27.1475°N 78.3869°E / 27.1475; 78.3869
Elevation163 metres (535 ft)
System Indian Railways station
Owned byIndian Railways
Operated byNorth Central Railway
LineKanpur–Delhi section
Platforms4
Construction
Structure typeStandard on ground
ParkingNo
Bicycle facilitiesNo
Other information
StatusFunctioning
Station codeFZD
Division(s) Prayagraj
History
Opened1865-66
Electrified1971–72
Previous namesEast Indian Railway Company
Location
Firozabad railway station
Location in Uttar Pradesh

Firozabad railway station is on the Delhi-kanpur section of Delhi-Howarah Main line and Howrah–Gaya–Delhi line. It is located in Firozabad district in the Indian state of Uttar Pradesh. It serves Firozabad.

History

Through trains started running on the East Indian Railway Company's Howrah–Delhi line in 1866.[1]

Trains

Railway Administration

This section is under the administrative control of a Junior/Senior Scale officer generally designated as Assistant Divisional Engineer headquartered at Firozabad. This section falls under the Prayagraj Division of North Central Railway Zone headquartered at Prayagraj. ADEN/DEN is assisted by a Permanent Way Supervisor and Works Supervisor generally designated as SSE/P-Way or SSE/Works. The maintenance of all the track and works comes under administrative control of ADEN/DEN. Generally a Group-'A' officer of Engineering Services Examination is posted at this post.[2]

The tenures of Various Officers posted as Assistant Divisional Engineer and/or Divisional Engineers at Firozabad is as summarised below:

S. No. Name Post From (DD-MM-YYYY) To (DD-MM-YYYY)
1 Shri N. S. Chouhan Assistant Engineer 01-01-1990 08-04-1991
2 Shri Arvind Kumar Singh Assistant Engineer 09-04-1991 18-02-1993
3 Shri Ravindra Kumar Goyal, IRSE Assistant Engineer 19-02-1993 28-02-1994
4 Shri Ravindra Kumar Goyal, IRSE Divisional Engineer 01-03-1994 16-07-1994
5 Shri Anurag, IRSE Assistant Engineer 16-07-1994 31-12-1996
6 Shri Anurag, IRSE Divisional Engineer 31-12-1996 14-06-1997
7 Shri K. P. Singh Divisional Engineer 14-06-1997 13-04-1998
8 Shri Hirendra Singh Rana, IRSE Assistant Engineer 13-04-1998 07-02-1999
9 Shri Hirendra Singh Rana, IRSE Divisional Engineer 08-02-1999 21-05-1999
10 Shri Anil Kumar Assistant Engineer 21-05-1999 25-05-2001
11 Shri Anil Kumar Divisional Engineer 25-05-2001 21-02-2002
12 Shri Nand Ram, IRSE Assistant Engineer 21-02-2002 22-02-2002
13 Shri Nand Ram, IRSE Divisional Engineer 22-02-2002 22-06-2002
14 Shri Prakash Chandra Vyas Assistant Divisional Engineer 22-06-2002 20-03-2004
15 Shri Neeraj Bhandari, IRSE Assistant Divisional Engineer 20-03-2004 03-02-2006
16 Shri Neeraj Bhandari, IRSE Divisional Engineer 04-02-2006 21-03-2007
17 Shri Aashish Srivastava Assistant Divisional Engineer 21-03-2007 21-01-2009
18 Shri Aashish Srivastava Divisional Engineer 22-01-2009 02-03-2009
19 Shri S. S. Meena Assistant Divisional Engineer 02-03-2009 24-06-2009
20 Shri Shailendra Kumar, IRSE Assistant Divisional Engineer 24-06-2009 18-10-2011
21 Shri Piyush Kumar Mishra, IRSE Assistant Divisional Engineer 18-10-2011 07-10-2013
22 Shri Sudhir Kumar, IRSE Assistant Divisional Engineer 07-10-2013 18-03-2016
23 Shri Sudhir Kumar Sr. Assistant Divisional Engineer 18-03-2016 20-01-2017
24 Shri Saurabh Singh, IRSE Assistant Divisional Engineer 20-01-2017 13-04-2019
25 Shri U.V. Singh Yadav Assistant Divisional Engineer 13-04-2019 29-04-2022
26 Shri Ankit Kumar Shukla, IRSE Assistant Divisional Engineer 29-04-2022 30-05-2024
27 Shri Ankit Kumar Shukla, IRSE Sr. Assistant Divisional Engineer 30-05-2024 24-10-2024
28 Shri Himanshu Shekhar Singh Assistant Divisional Engineer 24-10-2024 Present

Electrification

The Panki–Tundla sector was electrified in 1971–72.[3]

Amenities

Firozabad railway station has one double-bedded non-AC retiring room.[4] It also has a light refreshment stall and a book stall.[5]

See also

References

  1. ^ "IR History: Early History (1832-1869)". IRFCA. Retrieved 28 June 2013.
  2. ^ Singh, Saurabh (North Central Railway). {{cite web}}: Check date values in: |date= (help); Missing or empty |title= (help); Missing or empty |url= (help)
  3. ^ "History of Electrification". IRFCA. Retrieved 28 June 2013.
  4. ^ "North Central Railway: Retiring Room Facilities". Trains Enquiry. Retrieved 28 June 2013.{{cite web}}: CS1 maint: deprecated archival service (link)
  5. ^ "Agra to Firozabad trains". Make my trip. Retrieved 28 June 2013.
Preceding station Indian Railways Following station
Hirangaon
towards ?
North Central Railway zone Makkhanpur
towards ?