Fenghuang Xincun station
Platform 2 | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 凤凰新村站 | ||||||||||
| Traditional Chinese | 鳳凰新村站 | ||||||||||
| Literal meaning | Fenghuang New Village Station | ||||||||||
| |||||||||||
| General information | |||||||||||
| Location | Gongye Avenue North (工业大道北) and Nantian Road (南田路) Haizhu District, Guangzhou, Guangdong China | ||||||||||
| Coordinates | 23°05′51″N 113°15′02″E / 23.0974°N 113.2506°E | ||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
| Line | Line 8 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Other information | |||||||||||
| Station code | 816 | ||||||||||
| History | |||||||||||
| Opened | 3 November 2010 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Fenghuang Xincun Station (Chinese: 凤凰新村站) is a station on Line 8 of the Guangzhou Metro. The underground station is located on Gongye Avenue North (工业大道北) in the Haizhu District. The station opened on November 3, 2010 after a delay caused by the cooling tower at Shayuan Station.[1] It was the terminus of the line until December 28, 2019 when the line was extended to Cultural Park station.
Station layout
| G | - | Exits |
| L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
| L2 Equipment Area |
- | Station equipment |
| L3 Platforms |
Platform 1 | 8 towards Jiaoxin (Tongfuxi) |
| Island platform, doors will open on the left | ||
| Platform 2 | 8 towards Wanshengwei (Shayuan) | |
Entrances/exits
The station has 3 points of entry/exit. Exit D was opened on 9 January 2026.[2]
Exit A is accessible via stairlift.
-
Exit A
-
Exit B
-
Exit D
Gallery
-
Concourse
References
- ^ 沙园站冷却塔昨复工 (in Simplified Chinese). 2010-09-02. Archived from the original on 2010-09-25. Retrieved 2010-10-07.
- ^ 李天研 (2026-01-08). "地铁八号线凤凰新村站D口9日启用,告别"单边"出入口". 广州日报. Archived from the original on 2026-01-08. Retrieved 2026-01-08.