Central Coast & Newcastle Line

Central Coast & Newcastle Line
A New South Wales D set "Mariyung" travelling to Newcastle, running alongside the Mullet Creek, Brisbane Water National Park
Overview
Service typeIntercity rail
Locale
Current operatorSydney Trains
Route
TerminiSydney Central
Newcastle Interchange
Stops36
Distance travelled165.60 km (102.90 mi)
Lines usedMain North railway line
Newcastle railway line
North Shore railway line
Technical
Rolling stockD set Mariyung
H set Oscar
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC from overhead catenary
Track ownerTransport Asset Manager of New South Wales
Timetable numberCCN
Route map
CCN Central Coast & Newcastle Line
km from
Central
23.4
Epping
25.4
Cheltenham
26.9
Beecroft
28.6
Pennant Hills
29.4
Thornleigh
31.7
Normanhurst
33.9
Hornsby
35.7
Asquith
37.7
Mount Colah
40.7
Mount Kuring-gai
44.7
Berowra
48.8
Cowan
57.4
Hawkesbury River
65.2
Wondabyne
72.6
Woy Woy
74.8
Koolewong
76.9
Tascott
78.1
Point Clare
80.9
Gosford
84.6
Narara
86.2
Niagara Park
87.7
Lisarow
90.6
Ourimbah
98.5
Tuggerah
101.1
Wyong
105.9
Warnervale
114.9
Wyee
123.3
Morisset
127.2
Dora Creek
137.3
Awaba
142.3
Fassifern
146.4
Booragul
147.6
Teralba
150.6
Cockle Creek
155.1
Cardiff
158.9
Kotara
161.1
Adamstown
162.9
Broadmeadow
164.6
Hamilton
165.6
Newcastle Interchange
Legend
Station
Interchange station
North Shore & Western Line
 Northern Line
Metro North West & Bankstown Line
Hunter Line
NSW TrainLink

Not all rail services shown

For closed stations, wheelchair
access and other features see:
Main North line
Newcastle line
North Shore line

The Central Coast & Newcastle Line (CCN) is an intercity rail service that services the Central Coast region, Newcastle in the Hunter region and Lake Macquarie. It connects the two largest cities in New South Wales, running from Central in Sydney along the Main North railway line to Broadmeadow, and to Newcastle Interchange in Newcastle on the Newcastle railway line.

Description of route

The route traverses the Main West route until Strathfield, where it diverts north and follows the route of the Main North line until Broadmeadow, before diverting east along the route of the Newcastle branch line. The line is electrified at 1500 volts DC throughout, and is primarily double track, although there are refuge loops at Hawkesbury River, Gosford, Wyong, Awaba, and Sulphide Junction (between Cockle Creek and Cardiff). Some services terminate at Gosford and Wyong.

Services primarily operate to and from Central (Sydney Terminal) via Strathfield. During morning and afternoon peak periods on weekdays, some services will operate in the peak direction from either Wyong or Gosford to Sydney Central via the North Shore Line, then continuing on as a T1 service from the Central suburban platforms to Blacktown.[1]

Sometimes, when there is trackwork between Strathfield and Hornsby, trains will operate via the North Shore line between Central and Hornsby, then follow the Main North railway line as normal.

History

Prior to electrification of the route, steam hauled passenger trains were varied.[2] From November 1929 until April 1988, the Newcastle Flyer operated on the route. From the time the line was electrified, services to Gosford were hauled by 46 class locomotives, their sphere of operation increasing as the wires were extended. After electrification to Newcastle, services were taken over by U and V sets. Later, the U sets were replaced by K and G sets which, in turn, were replaced by H sets.

The last electric locomotives were withdrawn in March 1998[3] with all services operated by electric multiple unit stock.

The section of the Newcastle railway line between Hamilton and Newcastle was closed on 25 December 2014. Until the opening of Newcastle Interchange in 2017, Hamilton served as the temporary northern terminus.[4] The closed section between Wickham and Newcastle was replaced with the Newcastle Light Rail that opened on 17 February 2019.[5][6]

On 27 June 2025, V sets completed operations on the Central Coast & Newcastle Line, following the rollout of the D sets.[7]

Services

Services via Strathfield depart from Central (Sydney Terminal) and since June 2025, services consist primarily of D sets, which can run in 4, 6, 8 or 10 car formation.[8][9] Weekday peak hour services via Gordon on the North Shore Line with 8 car H sets between Gosford or Wyong and Sydney Central via the North Shore line and then continues as a T1 suburban service to Blacktown on the Western Line.

As at January 2026, the Central Coast via North Shore peak services are operated by Oscar fleet. Transport for NSW lists the North Shore as a proposed Mariyung Fleet line[10]. It is presumed that 8 car variants of the Mariyung will operate on the North Shore due to North Sydney, Wynyard, and Town Hall stations being 8 cars in length and inside tunnels.

Upgrades

Completed

The line was electrified to Gosford in January 1960, Wyong in April 1982[11] and Newcastle in June 1984.[12]

As part of the Northern Sydney Freight Corridor project the following projects were completed:[13] The projects were:[14][15]

Project Description Start date Completion date
North Strathfield underpass Grade separation for southbound freight trains heading to Flemington 2013 June 2015
Epping to Pennant Hills third track Third track for northbound trains climbing 1 in 40 grades 2013 Mid-2016
Gosford passing loops One passing loop in each direction to allow fast trains to overtake slower trains 2013 April 2015

Proposed

Glendale station

A railway station is proposed to be constructed in Glendale as part of the Lake Macquarie Transport Interchange project. The station will be located between Cockle Creek and Cardiff railway stations and will have connections to buses. An extension of Glendale Drive leading to the proposed station has been built and completed in June 2017. However, construction of the station has not commenced.

New Warnervale station

A new station is proposed for Warnervale.[16][17] The draft Central Coast Transportation Strategy stated that construction of the new railway station was to be completed by 2016.[18] In October 2014 there were some differences between Wyong Council and the State Government over how a strategic piece of land should be developed at Warnervale.[19]

Rolling stock

The rolling stock of the Central Coast & Newcastle Line

Former

Patronage

The following table shows the patronage of each line of the NSW TrainLink Intercity network for the year ending 30 June 2025, based on Opal tap on and tap off data.[20]

2024–25 NSW TrainLink Intercity patronage by line
6,482,450
12,051,510
778,193
7,155,584
515,035


See also

References

  1. ^ "Central Coast & Newcastle line timetable". Transport for NSW.
  2. ^ Some Steam Trains of New South Wales in Retrospect: Trains to Newcastle and the Short North, Covell, Charles Australian Railway Historical Society Bulletin, October 2000 pp369-386
  3. ^ "Electric Locos" Railway Digest June 1998 page 35
  4. ^ Owen, Brodie (15 October 2017). "All stops to Wickham: transport interchange opens". Newcastle Herald. Archived from the original on 16 October 2017. Retrieved 16 October 2017.
  5. ^ "Light rail construction". Archived from the original on 3 October 2017. Retrieved 16 October 2017.
  6. ^ Light rail in Newcastle opening from Monday 18 February Archived 4 February 2019 at the Wayback Machine Transport for NSW 3 February 2019
  7. ^ Hohne, Josh (27 June 2025). "End of the line for Sydney's iconic V-set trains". www.9news.com.au. Retrieved 27 June 2025.
  8. ^ Minister for the Central Coast; Minister for the Hunter; Minister for Regional Transport and Roads; Minister for Transport (3 December 2024). "New Mariyung fleet welcomes first passengers onboard" (Ministerial media release). NSW Government. Archived from the original on 2 June 2025. Retrieved 4 December 2024.
  9. ^ Segaert, Anthony (3 December 2024). "Five years and $4 billion later, the verdict on our new intercity trains". The Sydney Morning Herald. Retrieved 4 December 2024.{{cite web}}: CS1 maint: deprecated archival service (link)
  10. ^ https://www.transport.nsw.gov.au/projects/current-projects/mariyung-fleet
  11. ^ Railway Sign Official Opening Gosford - Wyong Electrification 3 April 1982 Archived 27 March 2014 at the Wayback Machine Powerhouse Museum Collection
  12. ^ "The Official Opening of Newcastle Rail Electrification" Railway Digest July 1984 page 218
  13. ^ Northern Sydney Freight Corridor Locked In Archived 10 May 2013 at the Wayback Machine Minister for Infrastructure & Transport 7 December 2011
  14. ^ "Sydney's mega rail upgrade gets green light". The Construction Index. 7 December 2011. Retrieved 7 December 2011.
  15. ^ Industry Briefing Archived 4 March 2016 at the Wayback Machine Transport for NSW 24 January 2012
  16. ^ A new Central Coast Regional Growth and Infrastructure Plan Archived 27 December 2014 at the Wayback Machine New South Wales Planning & Environment Retrieved 27 December 2014
  17. ^ Warnervale Town Centre Development Control Plan 2012 Archived 30 December 2014 at the Wayback Machine New South Wales Planning & Environment
  18. ^ Warnervale Town Centre Archived 27 December 2014 at the Wayback Machine Wyong Shire Council 19 February 2014
  19. ^ NSW Government and Wyong Council in row over plans for key Warnervale land Archived 30 March 2015 at the Wayback Machine Daily Telegraph
  20. ^ "Train Patronage – Monthly Figures". Transport for NSW. Retrieved 2 March 2026.

Further reading