Capital Express (India)

Capital Express
Overview
Service typeExpress
LocaleBihar, West Bengal & Assam
Current operatorEast Central Railway
Route
TerminiAra Junction (ARA)
Kamakhya Junction (KYQ) New Jalpaiguri Junction (NJP)
Stops42
Distance travelled953 km (592 mi)
Average journey time22 hours 10 minutes
Service frequency
  • 4 days a week (13247/48)
  • 3 days a week (13245/46)
Train number13247 / 13248 / 13245/ 13246
On-board services
ClassesAC 2 Tier, AC 3 Tier, Sleeper Class, General Unreserved
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesE-catering
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Other facilitiesBelow the seats
Technical
Rolling stockLHB coach
Track gaugeBroad Gauge
Operating speed43 km/h (27 mph) average including halts.
Route map

The 13247 / 13248 Kamakhya–Arrah Junction Capital Express and 13245/13246 New Jalpaiguri-Arrah Junction Capital Express are the set of Capital express train belonging to East Central Railway zone that runs between Kamakhya Junction, New Jalpaiguri Junction and Ara Junction in India.[1][2][3]

Service

The 13245/46 Capital Express has average speed of 35 km/h and covers 490  km in 14h. The 13247/48 Capital Express has average speed of 39 km/h and covers 942 km in 24h.

Halts

Routes and halts of New Jalpaiguri - Arrah Express :
13245 NJP → ARA 13246 ARA → NJP
New Jalpaiguri Junction Arrah Junction
Siliguri Junction Danapur
Bagdogra Patna Junction
Galgalia Rajendra Nagar Terminal
Thakurganj
Kishanganj Patna Sahib
Barsoi Junction Banka Ghat
Dalkhola Fatuha Junction
Katihar Bakhtiyarpur Junction
Naugachia Barh
Mansi Junction Barauni Junction
Begusarai Begusarai
Barauni Junction Mansi Junction
Barh Naugachia
Bakhtiyarpur Junction Katihar
Fatuha Junction Dalkhola
Banka Ghat Kishanganj
Rajendra Nagar Terminal Aluabari Road
Patna Sahib Thakurganj
Patna Junction Galgalia
Danapur Bagdogra
Arrah Junction Siliguri Junction
New Jalpaiguri Junction


Routes and halts of Kamakhya - Arrah Capital Express :
13247 KYQ → ARA 13248 ARA → KYQ
Kamakhya Junction Arrah Junction
Goalpara Danapur
New Bongaigaon Patna Junction
Alipurduar Junction Rajendra Nagar Terminal
Hasimara Patna Sahib
Binnaguri Banka Ghat
New Mal Junction Fatuha Junction
Siliguri Junction Bakhtiyarpur Junction
Bagdogra Barh
Galgalia Barauni Junction
Thakurganj Begusarai
Kishanganj Mansi Junction
Barsoi Junction Naugachia
Dalkhola Katihar
Katihar Dalkhola
Naugachia Kishanganj
Mansi Junction Aluabari Road
Begusarai Thakurganj
Barauni Junction Galgalia
Barh Bagdogra
Bakhtiyarpur Junction Siliguri Junction
Fatuha Junction New Mal Junction
Banka Ghat Binnaguri
Patna Sahib Hasimara
Rajendra Nagar Terminal Alipurduar Junction
Patna Junction New Bongaigaon
Danapur Goalpara
Arrah Junction Kamakhya Junction

Coach composition

Both trains has LHB coach. The train consists of 22 coaches:

  • 1 AC First Cum 2 Ac-class
  • 4 AC II Tier
  • 4 AC III Tier
  • 8 Sleeper Coaches
  • 3 General
  • 2 EOG Rake

Traction

Both Capital Express are hauled by a Samastipur Loco Shed / Siliguri Loco Shed / Gomoh Loco Shed-based WAP-7 electric locomotive on its entire journey.

Reversal

13247/48 train reverses direction at Siliguri Junction.

13245/46 train has no reversals.

Rake sharing

See also

References

  1. ^ Railway orders probe into Patna–Guwahati Capital Express derailment, 3 suspended
  2. ^ Railway stops train movement over Dooars section to save elephant
  3. ^ "NFR train services resume". Archived from the original on 23 January 2019. Retrieved 16 July 2017.