B28 (trainset)
The B28 is an under-development high-speed EMU set, built for the Mumbai-Ahmedabad High speed rail corridor.Its development was first publicly announced by the Standing Committee on Railways on 11 March 2026. BEML has designed and developed the trainsets with two rakes under construction in Bengaluru.It is planned to achieve operational clearance in late 2027.The trainset has been designed for use at a speed of 280 kmph and will be upgraded to achieve 350 kmph along with ETCS Level 2 signalling systems.[1][2][3][4]
See also
References
- ^ "Bullet train project to start operations with Bharat-made trainsets: House panel report". The Indian Express. 2026-03-10. Retrieved 2026-03-13.
- ^ www.ETInfra.com. "What is B28? India's first bullet train to run on Bharat-made trainset by 2027". ETInfra.com. Retrieved 2026-03-13.
- ^ https://www.newsonair.gov.in/first-bullet-train-to-run-between-mumbai-ahmedabad-on-15-august-2027-says-ashwini-vaishnaw/#:~:text=8:07%20AM-,India%27s%20first%20bullet%20train%20to%20be%20launched%20on%20August%2015,Train%20on%2015th%20August%202027.
- ^ https://www.pib.gov.in/PressReleasePage.aspx?PRID=2226523®=3&lang=2